The potential for a mega-earthquake in the Cascadia Subduction Zone is high, according to scientists, and that has provoked debate over the seismic resilience of Oregon schools.
Parents have concerns about the safety of the buildings in a major earthquake, and advocates for more resilient buildings also point out that schools are well suited for the role of disaster shelters if they are strong enough to withstand temblors. Schools tend to be evenly distributed throughout neighborhoods, and they often have large, open spaces like cafeterias and gymnasiums that easily can be converted to sleeping areas.
The school district in Beaverton, Ore., is using a $680 million bond to design its new schools to double as emergency shelters and be functional shortly after an earthquake. Its new $98 million high school is designed with an emergency generator, and plumbing and electric wiring constructed with emergency services in mind. These features cost the district $900,000.
A structural engineer that wrote a paper on Beaverton’s resilient school designs says that communities should have conversations about school resilience before putting bond measures to vote.
Related Stories
Codes and Standards | Sep 13, 2017
OSHA issues extension for compliance with crane operator certification requirements
Comments on proposed rule sought through Sept. 29.
Codes and Standards | Sep 12, 2017
Washington, D.C. is first LEED Platinum city in the world
All city government buildings are powered by renewables.
Codes and Standards | Sep 11, 2017
Natural solutions would be most effective flood resilience policies for Houston
New green infrastructure should be part of rebuild.
Codes and Standards | Sep 8, 2017
Los Angeles luxury high-rise is first U.S. apartment building to achieve WELL Multifamily certification
Hollywood Proper Residences have verified indoor air and water quality features.
Codes and Standards | Sep 7, 2017
More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone
Properties outside of these zones are not required to carry flood insurance.
Codes and Standards | Sep 6, 2017
Seventy percent of contractors have trouble finding workers
AGC survey indicates that fewer companies may be able to bid on projects.
Codes and Standards | Sep 5, 2017
New CTBUH initiatives to investigate link between fire and façades
In wake of Grenfell tragedy, Council forms new workgroup.
Codes and Standards | Sep 1, 2017
U.S. markets with the largest hotel construction pipeline
New York has the largest hotel construction pipeline of any U.S. market.
Codes and Standards | Aug 30, 2017
Trump rescinds elevation requirements for federally funded buildings and infrastructure
Flood protection on subsidized housing, hospitals, and other public buildings rolled back.
Codes and Standards | Aug 30, 2017
Stormwater runoff mitigation pays off for some building owners
Rain gardens, green roofs, cisterns, and rainwater recycling add value.