flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Community-led effort aims to prevent flooding in Chicago metro region

Codes and Standards

Community-led effort aims to prevent flooding in Chicago metro region

The RainReady Calumet Corridor project is focused on rain gardens, bioswales, natural detention basins, green alleys, and permeable pavers.


By Peter Fabris, Contributing Editor  | August 31, 2023
Photo by Sebastian Palomino

Photo by Sebastian Palomino

To address increased incidents of flooding, a community-led initiative in the Chicago area is having local people identify solutions that best fit their needs.

RainReady Calumet Corridor project favors solutions that use natural and low-impact projects such as rain gardens, bioswales, natural detention basins, green alleys, and permeable pavers, to reduce the risk of damaging floods. A recent study found that extreme weather events and heavy rainfall disproportionately affect people of color and immigrants in the area.

The project in Cook County, Ill., could be an effective way to give residents experiencing chronic flooding issues who have been left out of discussions a say in how to respond to flooding. 

An official with the Metropolitan Water Reclamation District says that the flooding problem in the Chicago region is so large that a foolproof solution would be cost prohibitive. Mitigation efforts will need to be different in each community, so local people should decide what’s best for them, the reasoning goes.

Final implementation in the areas involved is expected to start between fall 2023 and spring 2025. If the project works well, its leaders hope to replicate it in other parts of the county and nationwide.

Related Stories

Codes and Standards | Jan 5, 2021

EPA finalizes first major update to Lead and Copper rule

Will accelerate pace of lead service line replacement.

Codes and Standards | Jan 5, 2021

Flood risk for affordable housing expected to triple by 2050

Some communities will have 90% of their affordable housing at risk.

Codes and Standards | Jan 4, 2021

Ranks of remote workers expected to double in five years

Nearly 23% of employees will work from outside of offices.

Codes and Standards | Dec 28, 2020

CSI and ASTM standards can now be connected through a central location

CROSSWALK web service accesses standards specific to projects from feasibility to turnover.

Codes and Standards | Dec 28, 2020

Dept. of Energy offers Better Buildings Field Validation Results Hub

One-stop-shop for information associated with technology validations in buildings.

Codes and Standards | Dec 28, 2020

2021 Defense Authorization Act includes mass timber provision

Directs defense, agriculture secretaries to review potential for wood frame construction on defense building projects.

Codes and Standards | Dec 28, 2020

New York City proposal would require rainwater detention tanks for new development

Rule would apply to projects on lots sized 20,000 sf or larger.

Codes and Standards | Dec 17, 2020

Energy efficiency as a service gaining ground as financing approach for adopting innovations

Building owners can invest in new technology with no upfront cost.

Codes and Standards | Dec 16, 2020

Resources available to address Legionella threat

Buildings reopened after extended pandemic closure are at risk.

Codes and Standards | Dec 16, 2020

New Specifications for Concrete Construction reference manual released

Scope expanded to include shotcrete, internal curing, mineral fillers, and recycled concrete aggregates.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021