flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Commonwealth Pier revitalization project begins construction in Boston’s Seaport

Mixed-Use

Commonwealth Pier revitalization project begins construction in Boston’s Seaport

CBT, in collaboration with Schmidt Hammer Lassen Architects designed the project.


By David Malone, Associate Editor | October 19, 2020
Commonwealth Pier west view

Renderings courtesy CItyscape Digital for Pembroke

CBT has recently announced construction has begun on the revitalization project for the Seaport World Trade Center on Commonwealth Pier in Boston’s Seaport. The project will serve as a rejuvenated, modern iteration of the historic site, providing enhanced public realm benefits and creating a multi-use community destination at the heart of Boston’s Seaport District.

The project will transform the 705,000-sf building and pier into a hub that accents, further enlivens, and extends Boston’s Seaport neighborhood by strengthening the resiliency of the building, improving the accessibility of the waterfront, and offering robust public amenities. The project will create 45,000 sf of retail space, 56,000 sf of event and meeting space, and a responsive, future-ready workplace environment.

 

Commonwealth Pier east view

 

The new Commonwealth Pier will re-engage the waterfront and open up a natural amenity to pedestrians, community members, and visitors. The connection to the Harborwalk, paired with an open-air Harbor Plaza that will engage street front retail, programmed niches and alcoves carved out along the building’s exterior, and improved docking areas, will establish a seamless, active, and inviting public realm.

 

Commonwealth Pier plaza view

 

CBT also oversaw the technical climate adaptation elements of the project, integrating design strategies at both the building and site level to adhere to 2070 resiliency goals. This approach will make Commonwealth Pier one of the most resilient buildings in Boston.

Pembroke is developing the project.

Related Stories

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

Mixed-Use | Feb 7, 2017

Traditional Arab architecture and the surrounding mountainous terrain inspire a luxury hotel in Mecca

The Foster + Partners-designed building will address the shortage of accommodation in Mecca.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Mixed-Use | Jan 26, 2017

New renderings provide glimpse into large mixed-use project, Circa

The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021