flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Commercial building owners having tougher time securing insurance policies and renewals

Codes and Standards

Commercial building owners having tougher time securing insurance policies and renewals

Insurers’ fears of civil unrest in wake of election prompt builder’s risk coverage moratoriums.


By Peter Fabris, Contributing Editor | November 4, 2020

Courtesy Pixabay

Some of the nation’s largest commercial property insurers have put moratoriums on issuing new insurance policies and renewing current ones due to fear of potential civil unrest resulting from a closely contested presidential election.

The multifamily sector has been most impacted, but other all sectors have been affected. The situation has been most acute in urban areas, including Chicago, New York, Portland, Ore., and Los Angeles.

Some insurance carriers haven’t pulled back from the market, but even a few lenders waiting things out to see what happens following the election is burdensome for larger projects. In the current climate, projects cannot secure builder's risk coverage from just one carrier and must instead use three or four carriers. That raises project costs.

Insurers that have instituted moratoriums say they will continue to put policy decisions on hold until at least after the election. If the election becomes a drawn-out, litigious affair, that may mean moratoriums could be extended for many weeks.

Related Stories

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

Codes and Standards | Jan 13, 2020

Kansas City is first in nation to offer free public transportation

Aim is to increase mobility to spur more economic activity.

Codes and Standards | Jan 9, 2020

Dept. of Defense will require beefed up cybersecurity standards in January

All contractors will have to demonstrate secure practices.

Codes and Standards | Jan 8, 2020

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.

Codes and Standards | Jan 8, 2020

Energy efficiency initiatives have significantly cut energy consumption per square foot

Lighting and space heating fell by more than 600 trillion Btu from 2003 to 2012.

Building Technology | Jan 7, 2020

Tariff whiplash for bifacial solar modules

Bifacial solar systems offer many advantages over traditional systems.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021