flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Commercial and multifamily construction starts rebounded in 2021

Codes and Standards

Commercial and multifamily construction starts rebounded in 2021

Following COVID uncertainty in 2020, the industry recovered, but still lags 2019 levels.


By Peter Fabris, Contributing Editor | February 2, 2022
Bulldozer on a construction site

Courtesy Pixabay

After stalled projects and uncertainties due to COVID plagued the construction industry in 2020, commercial and multifamily construction starts bounced back in 2021, according to Dodge Construction Network.
 
Commercial and multifamily construction starts increased 16% nationwide in 2021. But starts remain below 2019 levels, indicating that the sector has not fully recovered from the impact of the pandemic.
 
In the top 20 metro areas, commercial and multifamily starts were 5% below the level recorded in 2019, and national commercial and multifamily starts were just 2% below the 2019 level. Larger metro regions have lagged other areas as demand for construction shifted away from denser urban zones.  

In the top 10 metro areas, commercial and multifamily starts were 9% below their 2019 levels, while starts in the metro areas ranked 11-20 were up 5% from 2019. This shows that in 2021, smaller, less dense metropolitan areas became increasingly popular.

Related Stories

| Jan 2, 2014

Measuring whole building energy use among big changes in LEED v4

A new prerequisite in LEED v4 calls for each project to measure whole building energy use, and then share that data with USGBC.

| Jan 1, 2014

San Francisco hosts Net Positive Energy + Water Conference

The Living Building Challenge’s Net Positive Energy + Water Conference will be held Feb. 4-5 in San Francisco.

| Dec 27, 2013

California’s new Title 24 energy code compliance date pushed back to July 1, 2014

Due to the stringency of the provisions in California’s new Title 24 energy codes, their implementation has been postponed until July 1, 2014 to allow jurisdictions and engineers to prepare for them.

| Dec 27, 2013

$1 billion 'city within a city' development approved by Coachella, Calif., city council

The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.

| Dec 26, 2013

OSHA may require companywide reporting of injuries and illnesses

The Occupational Safety and Health Administration is considering a change in policy that would require organizations to submit company-wide data on illnesses and injuries. 

| Dec 26, 2013

USGBC recognizes Ohio for achieving 100th LEED-certified public school

The U.S. Green Building Council (USGBC) has recognized the state of Ohio and the Ohio School Facilities Commission (OSFC) on the LEED certification of the 100th public school building in the state. 

| Dec 26, 2013

WDMA launches project to create ISO-compliant architectural doors

WDMA's National Architectural Door Council has initiated a project to create ISO-compliant Product Category Rules for architectural wood flush and stile and rail doors

| Dec 19, 2013

Defense Department okays Green Globes standard for DoD facilities

The Green Globes certification program from the Green Building Initiative can be used for the renovation and construction of Department of Defense facilities following agency endorsement.

| Dec 19, 2013

New York City proposal may boost standards for crane maintenance

New York City may boost maintenance standards for cranes operating in the city, including the addition of load cycle counters to record data regarding every lift that a crane performs.

| Dec 19, 2013

Lawmakers say EPA’s Energy Star standards lack transparency

A bipartisan group of lawmakers is raising concerns that the Environmental Protection Agency has not been transparent in drafting energy-efficiency standards under the Energy Star program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021