flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Columbia University to begin construction on New York City’s first all-electric academic research building

University Buildings

Columbia University to begin construction on New York City’s first all-electric academic research building

KPF’s design uses significantly less energy than similar buildings and supports the school’s net-zero goals.


By Novid Parsi, Contributing Editor | April 10, 2024
Rendering RGB, courtesy KPF - Columbia University to begin construction on New York City’s first all-electric academic research building
Rendering RGB, courtesy KPF

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

With a design that uses significantly less energy than similar buildings, the Biomedical Research Building will outperform emission limits set by local law and is expected to perform 30% more efficiently than the commercial building benchmark. The facility also supports Columbia University’s plan to introduce no new fossil fuel infrastructure into campus buildings and to achieve campus-wide net-zero emissions by 2050. 

Because laboratories have greater ventilation requirements than other buildings, they require more robust mechanical systems, which typically result in increased energy usage. The design team worked with sustainability consultant Atelier Ten to create an all-electric research lab building that could handle the facility’s high heating loads. 

Illustration: RGB, courtesy KPF
Illustration: RGB, courtesy KPF

The Biomedical Research Building is heated and cooled with electric air source heat pumps that allow for energy recovery between the heating and cooling fluids, providing periods of free tempering during the year. Air-side energy recovery systems use waste heat to reduce the total energy needed to condition the building. 

The high-performance façade features a window-to-wall ratio below 50%. Exterior shading and a louver system reduce solar heat gain and glare while reflecting natural light into the labs.

The building’s design integrates biophilic elements such as green walls and natural and renewable materials in collaboration spaces. A large connecting stair encourages active circulation, and corner lounges foster collaboration among researchers.

On the Building Team:
Architect: Kohn Pedersen Fox (KPF) 
MEP engineer: AKF Group
Structural engineer: Hatfield Group
Sustainability consultant: Atelier Ten 
Lab planning consultant: Jacobs 
Construction manager: LF Driscoll Healthcare

Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF

 

Related Stories

| Jul 25, 2012

KBE Building renovates UConn dining hall

Construction for McMahon Dining Hall will be completed in September 2012.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 1, 2012

White paper discusses benefits of diaphragm and piston flushometer valves

The white paper highlights considerations that impact which type of technology is most appropriate for various restroom environments.

| Apr 13, 2012

Goettsch Partners designs new music building for Northwestern

The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to the stage, as well as a 50-foot-high wall of cable-supported, double-skin glass

| Apr 13, 2012

Best Commercial Modular Buildings Recognized

Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


K-12 Schools

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

A new K-12 STEM Center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively space for students to immerse themselves in STEM subjects. Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021