flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Columbia University to begin construction on New York City’s first all-electric academic research building

University Buildings

Columbia University to begin construction on New York City’s first all-electric academic research building

KPF’s design uses significantly less energy than similar buildings and supports the school’s net-zero goals.


By Novid Parsi, Contributing Editor | April 10, 2024
Rendering RGB, courtesy KPF - Columbia University to begin construction on New York City’s first all-electric academic research building
Rendering RGB, courtesy KPF

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

With a design that uses significantly less energy than similar buildings, the Biomedical Research Building will outperform emission limits set by local law and is expected to perform 30% more efficiently than the commercial building benchmark. The facility also supports Columbia University’s plan to introduce no new fossil fuel infrastructure into campus buildings and to achieve campus-wide net-zero emissions by 2050. 

Because laboratories have greater ventilation requirements than other buildings, they require more robust mechanical systems, which typically result in increased energy usage. The design team worked with sustainability consultant Atelier Ten to create an all-electric research lab building that could handle the facility’s high heating loads. 

Illustration: RGB, courtesy KPF
Illustration: RGB, courtesy KPF

The Biomedical Research Building is heated and cooled with electric air source heat pumps that allow for energy recovery between the heating and cooling fluids, providing periods of free tempering during the year. Air-side energy recovery systems use waste heat to reduce the total energy needed to condition the building. 

The high-performance façade features a window-to-wall ratio below 50%. Exterior shading and a louver system reduce solar heat gain and glare while reflecting natural light into the labs.

The building’s design integrates biophilic elements such as green walls and natural and renewable materials in collaboration spaces. A large connecting stair encourages active circulation, and corner lounges foster collaboration among researchers.

On the Building Team:
Architect: Kohn Pedersen Fox (KPF) 
MEP engineer: AKF Group
Structural engineer: Hatfield Group
Sustainability consultant: Atelier Ten 
Lab planning consultant: Jacobs 
Construction manager: LF Driscoll Healthcare

Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF
Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF
Rendering RGB, courtesy KPF

 

Related Stories

University Buildings | Aug 3, 2020

5 reasons universities are renovating student housing

Clark Nexsen’s Student Life practice leader, Peter Aranyi, discusses the benefits of renovation and why it offers particular value to campuses nationwide.

University Buildings | Aug 2, 2020

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

University Buildings | Jul 24, 2020

A hybrid learning approach could redefine higher education

Universities reassess current assets to determine growth strategies.

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

University Buildings | Jul 14, 2020

Cornell College partners with Johnson Controls to improve campus energy efficiency

The plan will reduce the college’s energy usage by 20%.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021