flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Colorado State University, DLR Group team to study 12 high-performance schools

Colorado State University, DLR Group team to study 12 high-performance schools

Study evaluated energy performance, occupant health, and student performance


By DLR Group | April 25, 2013

DLR Group and the Institute for the Built Environment (IBE) at Colorado State University have collaborated on a research project to evaluate the effect of green school design on occupants and long-term building performance. IBE recently published the research report titled, "Linking Performance & Experience – An Analysis of Green Schools."

The findings show schools designed by DLR Group are more energy efficient, provide more space per student, and are constructed for less cost compared to regional averages for schools constructed during the same year. The overwhelming perception of school staff is that the learning environments within DLR Group green schools have a positive impact on health, achievement, and behavior.

“Design does not stop when the school opens," said DLR Group Senior Principal Jim French, AIA, who leads the firm’s K-12 practice. "The design process must include coming back to a project to measure building performance. If both the tangible metrics of energy efficiency and the intangible metrics of student and occupant satisfaction are not being evaluated, then as design professionals we are not truly meeting the needs of our K-12 clients and the communities they serve.”

The IBE researched 12 schools in eight states offering preschool through 8th grade instruction. IBE evaluated P-8 schools because these facilities offer a more controlled and consistent operational environment for study. For the purposes of the study, the schools in the research sample were third party certified or align with criteria for certification as sustainable buildings, and were in operation for at least 12 months.

The key findings include:

  • A motivator to improve student health was only mentioned by a handful of respondents. However, when asked specifically about student health, 87% of respondents reported that they perceived a positive impact on student health, with most respondents specifically describing the positive impact of daylighting.
  • 85% of respondents reported that their health and productivity were positively affected by the building.
  • 71% of respondents perceived that the building has a positive effect on student achievement
  • 71% perceived a positive effect on student behavior. For those that who did not share this perspective, many stated that it is very hard for them to identify the effect because of the many other variables which influence student achievement and behavior.
  • Green building practices did not necessarily result in higher first costs. Out of the 10 sites in this sample, six were built for below the regional median cost for schools built in the same year, while four were built for costs greater than the regional median.
  • The sample mean Energy Star score was 81, which indicates that the buildings are operating in the top 19th percentile. Nine out of the eleven building evaluated for Energy Star have a score over 75 and would receive the Energy Star award.
  • Eight schools are operating at or better than the 2030 Challenge 50% reduction target. In addition, by organizing the schools by the year constructed, it is clear that over time the buildings' design has become increasingly more efficient.

Download the DLR Group/CSU high-performance schools study (PDF).

 

Related Stories

| Nov 7, 2012

John Portman & Associates awarded new high rise in China

108-story building to rise in Nanning, the Capital City of Guangxi Province.

| Nov 7, 2012

Two Thornton Tomasetti projects receive 2012 International Architecture Awards for Best Global Design

The awards, presented by the Chicago Athenaeum Museum of Architecture Design, the European Center for Architecture Art Design, and Urban Studies and Metropolitan Arts Press, Ltd., recognize excellence in architecture and urban planning.

| Nov 6, 2012

Honeywell donates first responder products for Hurricane Sandy relief and recovery efforts

Honeywell Humanitarian Relief Fund to provide aid to local employees affected by Hurricane Sandy.

| Nov 6, 2012

Uponor files patent infringement suit against Sioux Chief Manufacturing

Uponor is seeking damages and an injunction to prevent Sioux Chief from selling the PowerPEX F1960 Ring with Stop, which it believes violates Uponor’s patent.

| Nov 6, 2012

Simpson Strong-Tie donates $25K to hurricane support

The company will also be matching employees’ personal contributions to the Red Cross and other nonprofit disaster relief organizations.

| Nov 6, 2012

Goettsch Partners designs new tower in Shunde, China

200-meter-tall building will be located between Guangzhou and Hong Kong.

| Nov 5, 2012

Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals

The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.

| Nov 5, 2012

Trimble acquires Vico assets, extends design-build-operate capabilities

Software to add 5D management to Trimble’s Solutions for vertical construction contractors.

| Oct 30, 2012

Lord, Aeck & Sargent announces four student life facility wins

Projects recognize the architecture firm’s expertise on a nationwide basis.

| Oct 30, 2012

The Beck Group announces CEO succession plan

Current Eastern Division Director and company veteran, Fred Perpall, named CEO.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021