The CoorsTek Center, a four-story education and research facility on the Colorado School of Mines campus, has officially been completed.
The Center supports a range of academic and research activities and is the new home for the College of Applied Science and Engineering (CASE) and the Department of Physics. A metal and glass facade is vertically punctuated by service cores clad in dark masonry that help to anchor the building’s entrances. The building’s northwest exterior, which fronts the campus’s Kafadar Commons, comprises full-height glazing at Level 1, and vertical glass panels and metal fins at Levels 2 and 3 that float above and modulate as influenced by the building’s interior program.
In addition to the CASE classrooms, the CoorsTek Center also includes general classroom space such as media-intensive “Active Learning” rooms that are flexible and can be rearranged for group work and discussions. A promenade on Level 1 incorporates seating and collaborative work areas that emulate tech workplaces to prepare students for post-college work life.
See Also: Suffolk breaks ground on large housing/dining complex for UMass Dartmouth
While Level 1 is available for the entire campus, Levels 2 and 3 contain dedicated teaching and research laboratories and faculty and graduate student offices. Below grade are additional lab spaces with specific lighting, sound, or vibration requirements.
Bohlin Cywinski Jackson designed the building in association with Anderson Mason Dale Architects.
Related Stories
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 14, 2012
Angelo State University opens doors to new recreation center expansion
Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.