flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Colorado School of Mines CoorsTek Center opens

University Buildings

The Colorado School of Mines CoorsTek Center opens

Bohlin Cywinski Jackson designed the building.


By David Malone, Associate Editor | January 29, 2019
CoorsTek Center at dusk

Photo: Nic Lehoux

The CoorsTek Center, a four-story education and research facility on the Colorado School of Mines campus, has officially been completed.

The Center supports a range of academic and research activities and is the new home for the College of Applied Science and Engineering (CASE) and the Department of Physics. A metal and glass facade is vertically punctuated by service cores clad in dark masonry that help to anchor the building’s entrances. The building’s northwest exterior, which fronts the campus’s Kafadar Commons, comprises full-height glazing at Level 1, and vertical glass panels and metal fins at Levels 2 and 3 that float above and modulate as influenced by the building’s interior program.

In addition to the CASE classrooms, the CoorsTek Center also includes general classroom space such as media-intensive “Active Learning” rooms that are flexible and can be rearranged for group work and discussions. A promenade on Level 1 incorporates seating and collaborative work areas that emulate tech workplaces to prepare students for post-college work life.

 

See Also: Suffolk breaks ground on large housing/dining complex for UMass Dartmouth

 

While Level 1 is available for the entire campus, Levels 2 and 3 contain dedicated teaching and research laboratories and faculty and graduate student offices. Below grade are additional lab spaces with specific lighting, sound, or vibration requirements.

Bohlin Cywinski Jackson designed the building in association with Anderson Mason Dale Architects.

Related Stories

University Buildings | Jun 14, 2021

Radford University’s new $80.5 million Center for Adaptive Innovation and Creativity

Hord Coplan Macht designed the project in collaboration with William Rawn Associates.

Education Facilities | Jun 4, 2021

Three ProConnect events coming this fall: Sustainability (Nov 2-3), Education (Nov 16-17), Multifamily (Dec 12-14)

SGC Horizon ProConnect 2021 schedule for Education, Multifamily, Office, and Single Family events.

University Buildings | Jun 1, 2021

Georgia Southern’s new $60 million Engineering and Research Building completes

The facility will serve as the new epicenter for engineering excellence and innovation in southeast Georgia.

University Buildings | May 26, 2021

Harvard University Science and Engineering Complex completes

Behnisch Architekten designed the project.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

University Buildings | May 17, 2021

Carolina Gaming Arena completes at UNC Chapel Hill

Clark Nexsen designed the project.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021