flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Codes should be updated to reflect lessons learned from recent extreme weather events

Codes and Standards

Codes should be updated to reflect lessons learned from recent extreme weather events

More can be done to boost resiliency to flooding, extended power outages.


By Peter Fabris, Contributing Editor | December 18, 2015
Codes should be updated to reflect lessons learned from recent extreme weather events

Photo: DVIDSHUB/Creative Commons

Codes and standards concerning emergency backup power and other key resiliency matters should reflect lessons learned from Hurricane Sandy and other recent major storms, says Bhavesh Patel, vice president, global marketing for ASCO Power Technologies.

One standard, the NFPA 110: Standard for Emergency and Standby Power Systems, 2013 edition says, “EPSS (emergency power supply system) equipment should be located above known previous flooding elevations where possible.” And later states, “For natural conditions, EPSS design should consider the ‘100-year storm’ flooding level predicted by the Sea, Lake, and Overland Surges from Hurricanes (SLOSH) models for a Class A hurricane.”

“The qualifiers in the two paragraphs – ‘where possible’ and ‘should consider’ – can dilute the effect of the code if the project specifiers are not strict and careful in determining what ‘possible’ can entail,” Patel writes. “The words ‘where possible’ and ‘should consider’ are not as straightforward in conveying intent as a more emphatic ‘must,’ and leaves the door open for less sense of the need to comply.”

Patel notes that a post-Hurricane Sandy task force has recommended that New York City codes be updated to locate building equipment higher to avoid flood damage, require sewage valves to prevent backflows during flooding, and provide for easy access to backup generator hookups.

Related Stories

Codes and Standards | May 8, 2018

Powerhouse coalition builds energy positive buildings

The goal: build buildings that provide more power than they cost to build, run, and demolish.

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

Codes and Standards | May 3, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 1, 2018

ASHRAE publishes new energy simulation-aided design standard

Requires building energy modeling during schematic design.

Codes and Standards | Apr 30, 2018

CALGreen projects pre-approved for streamlined LEED v4 requirements

Reduces need to run additional energy models.

Codes and Standards | Apr 26, 2018

New standard supports community resilience

ASTM International guidance supports cost-effective ways to withstand and recover from disasters.

Codes and Standards | Apr 25, 2018

Lessons learned from decades of Superfund cleanups guide contaminated land reuse

Sites repurposed for residential, commercial use, and solar energy generation.

Codes and Standards | Apr 24, 2018

Vibrant downtown core the key for urban multifamily development

Nighttime activity makes the difference.

Codes and Standards | Apr 19, 2018

ILFI launches new Zero Carbon Certification

Offers greater flexibility around project fuel types and offsetting renewables.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021