The addition of air curtains in the International Green Construction Code (IgCC), the new comprehensive high performance green building code, promises energy and construction cost savings for commercial, industrial and institutional buildings.
Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects. However, many times specifications are blocked by local jurisdictions that have adopted the International Energy Construction Code (IECC), which doesn't yet sight air curtains as vestibule alternatives.
Thus, the newly-enacted IgCC, which is scheduled for March 2012 publishing, now provides an approved overlay of green construction products to the base code IECC, which is overseen by the International Code Council, the Washington-based organization responsible for providing minimum safety, sustainability and affordability building codes and standards.
Recent proposals to the IgCC by the Air Movement and Control Association International (AMCA), Arlington Heights, Ill., helped establish air curtains as a vestibule alternative with the stipulation that they're tested in accordance with ANSI/AMCA Standard 220-05, "Laboratory Methods of Testing Air Curtains for Aerodynamics Performance Ratings."
Also helpful in the code modification effort were recent studies proving air curtains as 10% more energy-efficient than vestibules. The three-month research study “Air Curtains: A Proven Alternative to Vestibule Design” used second-party validation from research/validation consultant, Blue Ridge Numerics, Charlottesville, Va., with certified results from proven computational fluid dynamics (CFD) analysis.
Besides energy savings, vestibules, especially in retail settings, consume anywhere from 25 to 250 square feet of usable retail space and carry construction costs ranging from $3,750 to $37,500, based on an average of $150/square feet construction costs.
Meanwhile air curtain proponents will continue to present energy efficiency data to code committees, in hopes of instituting the vestibule alternative measure into the IECC. The next meeting on the subject is scheduled in January 2013.
Related Stories
| Jun 5, 2012
Walker Parking opens office in Abu Dhabi
Walker has been in Abu Dhabi since May 2011 but in a temporary office suite.
| Jun 5, 2012
Glumac hires Drit Shoemaker as new director of business development
Shoemaker will research, connect, and forge new client relationships with architects, developers, owners and brokers while strengthening relationships with current clients.
| Jun 5, 2012
Hoffman Architects Arbuckle elected president of New York/Tri-State DOCOMOMO
As chapter president, Arbuckle will guide and oversee the organization's efforts on behalf of Modern buildings and sites, and he will act as the main spokesperson for the organization.
| Jun 4, 2012
Brownfield goes green
Chicago Center for Green Technology uses high-speed, energy-efficient hand dryers to share its green message and earn LEED credits.
| Jun 4, 2012
KBE Building and CTA Construction awarded Project of the Year from CMAA
Award given for work done on the renovation of Beverly High School in Beverly, Mass.
| Jun 4, 2012
Pressley promoted to Senior VP and CIO at Hill International
Pressley will be responsible for managing all of Hill's information technology systems and software worldwide.
| Jun 4, 2012
Stalco Construction promotes Scott Pavick to chief estimator
Pavick manages the estimating department and is responsible for developing cost estimates and budgets, value engineering, and subcontractor bid evaluation and negotiations.
| Jun 4, 2012
HBD Construction to build new training campus in St. Louis
Larger campus facility will expand training opportunities for plumbers and pipefitters.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| Jun 1, 2012
Caruso to lead Gensler’s Asia talent development
Caruso will be based in Shanghai and working with the Gensler offices in Japan, China, South Korea, Singapore, Thailand, and India until the spring of 2013.