The addition of air curtains in the International Green Construction Code (IgCC), the new comprehensive high performance green building code, promises energy and construction cost savings for commercial, industrial and institutional buildings.
Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects. However, many times specifications are blocked by local jurisdictions that have adopted the International Energy Construction Code (IECC), which doesn't yet sight air curtains as vestibule alternatives.
Thus, the newly-enacted IgCC, which is scheduled for March 2012 publishing, now provides an approved overlay of green construction products to the base code IECC, which is overseen by the International Code Council, the Washington-based organization responsible for providing minimum safety, sustainability and affordability building codes and standards.
Recent proposals to the IgCC by the Air Movement and Control Association International (AMCA), Arlington Heights, Ill., helped establish air curtains as a vestibule alternative with the stipulation that they're tested in accordance with ANSI/AMCA Standard 220-05, "Laboratory Methods of Testing Air Curtains for Aerodynamics Performance Ratings."
Also helpful in the code modification effort were recent studies proving air curtains as 10% more energy-efficient than vestibules. The three-month research study “Air Curtains: A Proven Alternative to Vestibule Design” used second-party validation from research/validation consultant, Blue Ridge Numerics, Charlottesville, Va., with certified results from proven computational fluid dynamics (CFD) analysis.
Besides energy savings, vestibules, especially in retail settings, consume anywhere from 25 to 250 square feet of usable retail space and carry construction costs ranging from $3,750 to $37,500, based on an average of $150/square feet construction costs.
Meanwhile air curtain proponents will continue to present energy efficiency data to code committees, in hopes of instituting the vestibule alternative measure into the IECC. The next meeting on the subject is scheduled in January 2013.
Related Stories
| Aug 11, 2014
The Endless City: Skyscraper concept connects all floors with dual ramps
Rather than superimposing one floor on top of another, London-based SURE Architecture proposes two endless ramps, rising gradually with a low gradient from the ground floor to the sky.
| Aug 11, 2014
Will Alsop's funky 'high-rise on stilts' will be built over an apartment building in London
South London's riverfront will soon be graced by one of Will Alsop's eccentric designs: a curved apartment tower on purple stilts.
| Aug 11, 2014
New guide for prevention of thermal bridging in commercial buildings
The guide aims to overcome obstacles with respect to mitigating thermal bridging to reduce energy consumption in buildings.
| Aug 8, 2014
LEGO launches set aimed at professional architects
LEGO Architecture Studio is made up of 76 unique elements and over 1,200 pieces, and is intended to give the builder as much freedom as possible.
| Aug 8, 2014
First look: China's latest office development will take the shape of binary code
The Window of Guangzhou project will consist of three towers forming the number sequence "001."
| Aug 8, 2014
Government Sector Giants: Public-sector construction slow, but stirring [2014 Giants 300 Report]
Improving energy performance of existing properties through targeted upgrades and large-scale reconstruction continues to be a federal priority, according to BD+C's 2014 Giants 300 Report.
Sponsored | | Aug 8, 2014
Setting guidelines for construction PDF documents across the AEC industry
Sasha Reed interviews two members of the coalition responsible for creating new Guidelines for Construction PDF Documents. SPONSORED CONTENT
Sponsored | | Aug 8, 2014
Safe and secure: Fire and security glazing solution for Plaquemines Parish Detention Center
When the designers at L. R. Kimball looked for an all-in-one clear, wire-free glazing solution that protects against fire, bullets and forced entry for the new Plaquemines Parish Detention Center, SAFTI FIRST supplied a complete single-source tested and listed assembly that was easy to install and maintenance-free.
| Aug 7, 2014
Office Sector Giants: ‘Flex’ reigns supreme in hot office construction market [2014 BD+C Giants 300 Report]
The adage “doing more with less” has become a byword for many businesses since the Great Recession, and clients are trying to maximize every precious inch, according to BD+C's 2014 Giants 300 Report.
| Aug 6, 2014
BIG reinvents the zoo with its 'Zootopia' natural habitat concept [slideshow]
Bjarke Ingels’ firm is looking to improve the 1960s-designed Givskund Zoo in Denmark by giving the animals a freer range to roam.