Danish firm COBE has been announced the winner in a contest to design a new Adidas flagship building in Herzogenaurach, Germany. It beat out 29 other teams, including REX and Zaha Hadid.
The roof of COBE's diamond-shaped building will be made up of vertical concrete fins enclosed in glass. This transparent canopy will allow natural light into the building's interior, designboom reports.
Further bringing the outside in, most of the facility's curtain wall glass will open to the outdoors. In the winter, when these walls cannot be opened, employees and visitors will be able to visit small winter gardens throughout the headquarters.
The winning design, called Meet & Eat, includes an employee restaurant, public conference center, and a showroom.
In a statement, COBE Co-founder Dan Stubbegard said: "Adidas Meet & Eat merges with the landscape’s existing terrain, creating an open, green and welcoming building that gathers all members of the Adidas family—employees, sport stars, and visitors—as well as multiple functions and flows under one single roof. The iconic roof rests like a carpet covering the building, connecting all functions and creating a building flooded with light."
The project is slated for completion in 2018.
Related Stories
| Mar 7, 2012
Turner appointed Batson-Cook CFO and treasurer
Cecil G. Hood to continue in advisory role.
| Mar 7, 2012
Thornton Tomasetti names Dowdall VP of Kansas City office
Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Mar 7, 2012
Houlihan Lokey adds Steffen to Industrials Group
Steffen bolsters group with experience in the building materials and rorest product sectors.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago
Construction was completed by Skender in just 12 weeks.
| Mar 6, 2012
BLT Architects promotes two to associate
Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 5, 2012
Tishman constructing new courthouse in Philadelphia
Construction is underway for the Pennsylvania Department of General Services’ 510,000-sf facility.