Danish firm COBE has been announced the winner in a contest to design a new Adidas flagship building in Herzogenaurach, Germany. It beat out 29 other teams, including REX and Zaha Hadid.
The roof of COBE's diamond-shaped building will be made up of vertical concrete fins enclosed in glass. This transparent canopy will allow natural light into the building's interior, designboom reports.
Further bringing the outside in, most of the facility's curtain wall glass will open to the outdoors. In the winter, when these walls cannot be opened, employees and visitors will be able to visit small winter gardens throughout the headquarters.
The winning design, called Meet & Eat, includes an employee restaurant, public conference center, and a showroom.
In a statement, COBE Co-founder Dan Stubbegard said: "Adidas Meet & Eat merges with the landscape’s existing terrain, creating an open, green and welcoming building that gathers all members of the Adidas family—employees, sport stars, and visitors—as well as multiple functions and flows under one single roof. The iconic roof rests like a carpet covering the building, connecting all functions and creating a building flooded with light."
The project is slated for completion in 2018.
Related Stories
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.