flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COBE's striking 'concrete finned' scheme wins competition for Adidas' flagship building in Germany

COBE's striking 'concrete finned' scheme wins competition for Adidas' flagship building in Germany

The roof of COBE's diamond-shaped building will be made up of vertical concrete fins enclosed in glass. 


By BD+C Staff | December 12, 2014

Danish firm COBE has been announced the winner in a contest to design a new Adidas flagship building in Herzogenaurach, Germany. It beat out 29 other teams, including REX and Zaha Hadid. 

The roof of COBE's diamond-shaped building will be made up of vertical concrete fins enclosed in glass. This transparent canopy will allow natural light into the building's interior, designboom reports.

Further bringing the outside in, most of the facility's curtain wall glass will open to the outdoors. In the winter, when these walls cannot be opened, employees and visitors will be able to visit small winter gardens throughout the headquarters. 

The winning design, called Meet & Eat, includes an employee restaurant, public conference center, and a showroom. 

In a statement, COBE Co-founder Dan Stubbegard said: "Adidas Meet & Eat merges with the landscape’s existing terrain, creating an open, green and welcoming building that gathers all members of the Adidas family—employees, sport stars, and visitors—as well as multiple functions and flows under one single roof. The iconic roof rests like a carpet covering the building, connecting all functions and creating a building flooded with light."

The project is slated for completion in 2018.

 

Related Stories

| May 10, 2014

How your firm can gain an edge on university projects

Top administrators from five major universities describe how they are optimizing value on capital expenditures, financing, and design trends—and how their AEC partners can better serve them and other academic clients.

| May 9, 2014

It's official: Norman Foster-designed Harmon hotel and casino to be razed due to structural issues

Construction of the Las Vegas tower was halted in 2008 after experts discovered faulty steel beams in the structure. Now its owner, MGM, has received permission to demolish the building. 

| May 9, 2014

5 trends transforming higher education

Performance-based funding models and the adoption of advanced technologies like augmented reality for teaching are just a few of the predictions offered by CannonDesign's higher education sector leader, Brad Lukanic.

| May 9, 2014

40 Under 40: Where are they now?

BD+C catches up with two past U40 honorees: Matt Dumich of Adrian Smith + Gordon Gill Architecture and David Montalba of Montalba Architects

| May 8, 2014

Perfecting prefab: 8 tips for healthcare construction projects

Leading AEC firms offer helpful advice for using BIM to pull off prefab for everything from MEP infrastructure to whole bathrooms. 

| May 8, 2014

Don’t bother planning for the future - it doesn’t care about you

Though strategic planning has helped many businesses move forward, its time has passed. So says Economist and Author Bill Conerly. SPONSORED CONTENT

| May 8, 2014

Infographic: 4 most common causes of construction site fatalities

In honor of Safety Week, Skanska put together this nifty infographic on how to prevent deadly harm in construction. 

| May 8, 2014

Sporting events in style: Infographic showcases novel stadiums of the world

UK precast concrete maker Banagher, which specializes in precast stadia solutions, has assembled a list of the world's top stadiums in terms of architectural and structural design.

| May 7, 2014

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Las Vegas Mayor Carolyn Goodman wants your economic development ideas for remaking four areas within the city, including the Cashman Center and the Las Vegas Medical District.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021