The Northeast Ohio Regional Sewer District that serves the Cleveland area will allocate $650,000 of state funds for a grant program to pay private developers to use green elements for managing increased stormwater runoff from a road project. The sewer board also allocated $250,000 to build green infrastructure to help absorb rainwater throughout its area.
The district previously set aside $3 billion for “Project Clean Lake,” a federally mandated program to reduce rainwater and sewage that empty into Lake Erie. The district had been criticized for giving just minimal consideration to potentially less-costly and more aesthetically pleasing green solutions to stormwater runoff.
The district’s intent to use natural features to absorb stormwater reflects an urban trend that other cities including Philadelphia and Detroit have embraced.
In Cleveland, the green approach will be used to mitigate runoff from the $331 million Opportunity Corridor that will connect Interstate 490 with University Circle. The road expansion will require demolition of four homes and three businesses, and is expected to produce 600,000 gallons of runoff.
(http://www.cleveland.com/drain/index.ssf/2014/03/northeast_ohio_regional_sewer.html)
Related Stories
Codes and Standards | Jul 11, 2018
D.C. local worker requirement not being met
Government doing little to verify self-reported project data.
Codes and Standards | Jul 10, 2018
Carbon emissions in cement production threaten GHG reduction goals
Cement is essential to many infrastructure projects that address climate change.
Codes and Standards | Jul 10, 2018
DOE’s Better Buildings Summit to be held in Cleveland, August 21-23
Agenda includes technical training and networking opportunities.
Codes and Standards | Jul 6, 2018
Houston’s lessons learned from Harvey include lack of awareness by residents of flood danger
Inconsistent regulatory environment also cited.
Codes and Standards | Jul 6, 2018
Delos and HDR will co-develop wellness design tools and collaborate on research
WELL Building Standard pioneer teams with architects to advance wellness innovations in the built environment.
Codes and Standards | Jul 5, 2018
BREEAM New Construction standard launched in U.S.
Follows successful launch of BREEAM In-Use standard.
Codes and Standards | Jun 29, 2018
Nearly half of nonresidential construction projects now delivered by design-build
‘Alternative’ method now mainstream for nonresidential, highway/street, and water/wastewater construction projects.
Codes and Standards | Jun 28, 2018
Modular construction may be key to relieving housing crunch
May be only way to meet needs as ranks of construction workers decline.
Codes and Standards | Jun 27, 2018
Thirty nine San Francisco high rises at risk of collapse in major earthquake
Vulnerable buildings have welded columns and beams.
Codes and Standards | Jun 26, 2018
Boston enacts new climate resiliency rules for buildings
New policy is likely a first in the nation.