In times of crisis on a college or university campus, the ability to quickly communicate safety information to students, faculty and visitors is critically important. According to a recent study of Clery Act reports by Siemens Building Technologies division, analysis revealed that among institutions of higher learning, community colleges were least likely to have the integrated, multi-modal systems necessary to quickly reach the largest number of people when crisis strikes.
The Siemens-commissioned study Detailed Analysis of U.S. College and University Annual Clery Act Reports evaluated information submitted to the Federal government as part of the Jeanne Clery Disclosure of Campus Security Policy and Campus Crime Statistics Act (Clery Act). The study analyzed data from a sample of 77 U.S. colleges and universities to provide deeper insight into which types of institutions have the most advanced mass notification systems and how these differences manifest themselves geographically.
To make these determinations, the study classified the communications platforms into four types: At Your Side (text messaging, email, etc.), Indoor (public address system, digital signage, posted notices, etc.), Outside (outside public address system, warning sirens, blue light towers, etc.) and Extended (social media, CCTV, etc.). The institutions were then placed into five maturity levels that reflected the integration of different types of technology and the number of methods used in a notification system. None of the schools were ranked in the top level. Some of the report’s findings include:
- Community colleges are the least likely to have layered emergency communication plans, using mostly At Your Side methods
- Public universities tend to have the most sophisticated plans, including three or more types of communications platforms
- Overall, schools in the South have the most advanced notification plans with multi-modal systems that include three or more types of communications platforms.
As a follow up to their initial study, Siemens plans to analyze this year’s Clery Reports scheduled for release later this month. To download a copy of Detailed Analysis of U.S. College and University Annual Clery Act Reports, please visit www.usa.siemens.com/cleryreport. BD+C
Related Stories
Designers | Oct 19, 2022
Architecture Billings Index moderates but remains healthy
For the twentieth consecutive month architecture firms reported increasing demand for design services in September, according to a new report today from The American Institute of Architects (AIA).
Building Team | Oct 18, 2022
Brasfield & Gorrie chairman’s home vandalized by anti-development activists
Activists vandalized the home and vehicles of Miller Gorrie, chairman of Birmingham-based Brasfield & Gorrie, in protest of a planned $90 million, 85-acre police, fire and public safety training center in Atlanta.
Mixed-Use | Oct 18, 2022
Mixed-use San Diego tower inspired by coastal experience and luxury travel
The new 525 Olive mixed use San Diego tower was inspired by the coastal experience and luxury travel.
University Buildings | Oct 18, 2022
A carbon-neutral-ready university campus opens in Hong Kong
In early September, the Hong Kong University of Science and Technology (HKUST) officially opened its new, KPF-designed campus in Nansha, Guangzhou (GZ).
Market Data | Oct 17, 2022
Calling all AEC professionals! BD+C editors need your expertise for our 2023 market forecast survey
The BD+C editorial team needs your help with an important research project. We are conducting research to understand the current state of the U.S. design and construction industry.
Codes and Standards | Oct 17, 2022
Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers
California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.
Justice Facilities | Oct 17, 2022
San Antonio’s new courthouse aims to provide safety and security while also welcoming the public
The San Antonio Federal Courthouse, which opened earlier this year, replaces a courthouse that had been constructed as a pavilion for the 1968 World’s Fair.
Market Data | Oct 14, 2022
ABC’s Construction Backlog Indicator Jumps in September; Contractor Confidence Remains Steady
Associated Builders and Contractors reports today that its Construction Backlog Indicator increased to 9.0 months in September, according to an ABC member survey conducted Sept. 20 to Oct. 5.
| Oct 13, 2022
Boston’s proposed net-zero emissions code has developers concerned
Developers have raised serious concerns over a proposed new energy code by the City of Boston that would require newly constructed buildings over 20,000 sf to immediately hit net-zero emissions goals.
Education Facilities | Oct 13, 2022
A 44-acre campus serves as a professional retreat for public-school educators in Texas
A first-of-its-kind facility for public schools in Texas, the Holdsworth Center serves as a retreat for public educators, supporting reflection and dialogue.