In times of crisis on a college or university campus, the ability to quickly communicate safety information to students, faculty and visitors is critically important. According to a recent study of Clery Act reports by Siemens Building Technologies division, analysis revealed that among institutions of higher learning, community colleges were least likely to have the integrated, multi-modal systems necessary to quickly reach the largest number of people when crisis strikes.
The Siemens-commissioned study Detailed Analysis of U.S. College and University Annual Clery Act Reports evaluated information submitted to the Federal government as part of the Jeanne Clery Disclosure of Campus Security Policy and Campus Crime Statistics Act (Clery Act). The study analyzed data from a sample of 77 U.S. colleges and universities to provide deeper insight into which types of institutions have the most advanced mass notification systems and how these differences manifest themselves geographically.
To make these determinations, the study classified the communications platforms into four types: At Your Side (text messaging, email, etc.), Indoor (public address system, digital signage, posted notices, etc.), Outside (outside public address system, warning sirens, blue light towers, etc.) and Extended (social media, CCTV, etc.). The institutions were then placed into five maturity levels that reflected the integration of different types of technology and the number of methods used in a notification system. None of the schools were ranked in the top level. Some of the report’s findings include:
- Community colleges are the least likely to have layered emergency communication plans, using mostly At Your Side methods
- Public universities tend to have the most sophisticated plans, including three or more types of communications platforms
- Overall, schools in the South have the most advanced notification plans with multi-modal systems that include three or more types of communications platforms.
As a follow up to their initial study, Siemens plans to analyze this year’s Clery Reports scheduled for release later this month. To download a copy of Detailed Analysis of U.S. College and University Annual Clery Act Reports, please visit www.usa.siemens.com/cleryreport. BD+C
Related Stories
| Oct 14, 2011
Midwest construction firms merge as Black and Dew
Merger is aimed at increasing market sector capabilities and building on communication and core contracting competencies.
| Oct 14, 2011
AIA Continuing Education: optimizing moisture protection and air barrier systems
Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.
| Oct 12, 2011
BIM Clarification and Codification in a Louisiana Sports Museum
The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.
| Oct 12, 2011
Vertical Transportation Systems Reach New Heights
Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently.
| Oct 12, 2011
Building a Double Wall
An aged federal building gets wrapped in a new double wall glass skin.
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 12, 2011
Bulley & Andrews celebrates 120 years of construction
The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will
| Oct 11, 2011
AIA introduces five new documents for use on sustainable projects
These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.