In times of crisis on a college or university campus, the ability to quickly communicate safety information to students, faculty and visitors is critically important. According to a recent study of Clery Act reports by Siemens Building Technologies division, analysis revealed that among institutions of higher learning, community colleges were least likely to have the integrated, multi-modal systems necessary to quickly reach the largest number of people when crisis strikes.
The Siemens-commissioned study Detailed Analysis of U.S. College and University Annual Clery Act Reports evaluated information submitted to the Federal government as part of the Jeanne Clery Disclosure of Campus Security Policy and Campus Crime Statistics Act (Clery Act). The study analyzed data from a sample of 77 U.S. colleges and universities to provide deeper insight into which types of institutions have the most advanced mass notification systems and how these differences manifest themselves geographically.
To make these determinations, the study classified the communications platforms into four types: At Your Side (text messaging, email, etc.), Indoor (public address system, digital signage, posted notices, etc.), Outside (outside public address system, warning sirens, blue light towers, etc.) and Extended (social media, CCTV, etc.). The institutions were then placed into five maturity levels that reflected the integration of different types of technology and the number of methods used in a notification system. None of the schools were ranked in the top level. Some of the report’s findings include:
- Community colleges are the least likely to have layered emergency communication plans, using mostly At Your Side methods
- Public universities tend to have the most sophisticated plans, including three or more types of communications platforms
- Overall, schools in the South have the most advanced notification plans with multi-modal systems that include three or more types of communications platforms.
As a follow up to their initial study, Siemens plans to analyze this year’s Clery Reports scheduled for release later this month. To download a copy of Detailed Analysis of U.S. College and University Annual Clery Act Reports, please visit www.usa.siemens.com/cleryreport. BD+C
Related Stories
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.