In times of crisis on a college or university campus, the ability to quickly communicate safety information to students, faculty and visitors is critically important. According to a recent study of Clery Act reports by Siemens Building Technologies division, analysis revealed that among institutions of higher learning, community colleges were least likely to have the integrated, multi-modal systems necessary to quickly reach the largest number of people when crisis strikes.
The Siemens-commissioned study Detailed Analysis of U.S. College and University Annual Clery Act Reports evaluated information submitted to the Federal government as part of the Jeanne Clery Disclosure of Campus Security Policy and Campus Crime Statistics Act (Clery Act). The study analyzed data from a sample of 77 U.S. colleges and universities to provide deeper insight into which types of institutions have the most advanced mass notification systems and how these differences manifest themselves geographically.
To make these determinations, the study classified the communications platforms into four types: At Your Side (text messaging, email, etc.), Indoor (public address system, digital signage, posted notices, etc.), Outside (outside public address system, warning sirens, blue light towers, etc.) and Extended (social media, CCTV, etc.). The institutions were then placed into five maturity levels that reflected the integration of different types of technology and the number of methods used in a notification system. None of the schools were ranked in the top level. Some of the report’s findings include:
- Community colleges are the least likely to have layered emergency communication plans, using mostly At Your Side methods
- Public universities tend to have the most sophisticated plans, including three or more types of communications platforms
- Overall, schools in the South have the most advanced notification plans with multi-modal systems that include three or more types of communications platforms.
As a follow up to their initial study, Siemens plans to analyze this year’s Clery Reports scheduled for release later this month. To download a copy of Detailed Analysis of U.S. College and University Annual Clery Act Reports, please visit www.usa.siemens.com/cleryreport. BD+C
Related Stories
| Nov 6, 2012
Uponor files patent infringement suit against Sioux Chief Manufacturing
Uponor is seeking damages and an injunction to prevent Sioux Chief from selling the PowerPEX F1960 Ring with Stop, which it believes violates Uponor’s patent.
| Nov 6, 2012
Simpson Strong-Tie donates $25K to hurricane support
The company will also be matching employees’ personal contributions to the Red Cross and other nonprofit disaster relief organizations.
| Nov 6, 2012
Goettsch Partners designs new tower in Shunde, China
200-meter-tall building will be located between Guangzhou and Hong Kong.
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Nov 5, 2012
Trimble acquires Vico assets, extends design-build-operate capabilities
Software to add 5D management to Trimble’s Solutions for vertical construction contractors.
| Oct 30, 2012
Lord, Aeck & Sargent announces four student life facility wins
Projects recognize the architecture firm’s expertise on a nationwide basis.
| Oct 30, 2012
The Beck Group announces CEO succession plan
Current Eastern Division Director and company veteran, Fred Perpall, named CEO.
| Oct 30, 2012
Two-hour fire rated curtain wall passes CDC tests
CDC (Curtain Wall Design and Consulting) is an independent firm providing a wide range of building envelope design, engineering, and consulting services to design professionals nationwide.
| Oct 30, 2012
Wight & Company announces three hires
Expands team and adds staff to work on the UNO project.
| Oct 15, 2012
Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower
The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.