HDR Architecture, Inc. named two new regional directors for its Healthcare and Science + Technology business groups.
Abigail Clary, AIA, ACHA, LEED AP, has been named central region director for healthcare. A healthcare principal in the firm’s Chicago architectural office, Clary is recognized for her management skills and comprehensive approach to project delivery of complex medical facilities. She is an advocate for balancing operations, technology, and patient-centered care models to create environments that best support patients’ healing process while equally supporting those providing care. Clary an expert in creating collaborative teams and provides dynamic leadership for the myriad participants involved in a project team. Her industry awards, honors and design experience placed her on Building Design + Construction’s 2010 list of 40 Under 40 rising stars in the design industry.
Warren Hendrickson, AIA, LEED AP has been named central region director for science and technology. Hendrickson designed facilities for science and technology clients for more than 25 years as a laboratory planner, designer, manager or principal-in-charge for academic, government and corporate clients. Helping clients create a place to foster discovery and to promote health and safety is his motivation. Hendrickson’s knowledge of the goals, drivers, decision processes and leadership dynamics of technologically diverse projects allows him to challenge preconceived ideas to foster new solutions to traditional planning and design concepts. He is based in the firm’s Chicago office. BD+C
Related Stories
| Jun 12, 2013
More than 90% of New York City schools have code violations
More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.
| Jun 7, 2013
Must see: Building façade made of massive concrete drain pipes
Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.