flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

citizenM’s American expansion now includes second hotel in Boston

Hotel Facilities

citizenM’s American expansion now includes second hotel in Boston

The Back Bay property is also the kickoff of a new mixed development.


By John Caulfield, Senior Editor | September 5, 2024
Exterior of citizenM Boston Back Bay hotel
citizenM's 15-story Boston Back Bay hotel is its 10th in the U.S. Images: Courtesy of citizenM

CitizenM has opened its largest hotel to date globally.

The 399-room citizenM Boston Back Bay is the brand’s second property in Boston. The 15-story 151,726-sf building was designed by citizenM’s longtime architecture partner, Concrete Amsterdam, with the Boston-based firm Elkus Manfredi Architects. CitizenM Boston Back Bay represents the brand’s 36th hotel worldwide, and continues the brand’s push into the U.S.: citizen M opened its first hotel in Austin last March, and its third Miami-area property, Miami South Beach, last month. With the Boston property, citizenM has 10 hotels in the U.S.

The Boston project’s codeveloper is Samuel & Associates, and its general contractor is Suffolk Construction. The cost of the hotel is confidential, according to the company.

Tight quarters: All of the rooms in citizenM Boston Back Bay are identical, and designed for two adults, with one extra-large bed to share. 

CitizenM promotes itself as an “affordable luxury” brand. Its hotel features wall-to-wall windows, luxury bedding and towels, and iPad room controls. The facility’s highlights include The Living Room, with books, art, designer furniture and designated workspaces; collectionM, a retail space on the first floor with travel essentials, gifts, and books; canteenM, an open-plan, grab-and-go dining area open 24 hours; a rooftop bar, a 3rd-floor gym, and one-minute check in and out.

Hotel is first step in a bigger plan

The hotel’s design team commissioned a section of the entrance façade from Maria Molteni, an interdisciplinary artist and designer.

canteenM offers 24/7 food and beverage service.

The Boston hotel is within walking distance of Fenway Park, home to the Boston Red Sox baseball team. The hotel’s opening is part of the first stage of Lyrik, a mixed-use development that includes a 450,000-square-foot lab and office space housing the CarGurus Global Headquarters and The LEGO Group, the latter of which started moving employees into this space last spring. The development is also the first Boston-based outpost for the electirc carmaker Rivian. This fall, Pink Carrot and CHICHA San Chen will join Lyrik’s lineup. By spring 2025, Lyrik will have added George Howell Coffee, Van Leeuwen Ice Cream, and the Greek restaurant Avra Estiatorio.

The hotel's “Living Room" includes designated workspaces.

Related Stories

| Sep 16, 2013

Study analyzes effectiveness of reflective ceilings

Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.

| Sep 13, 2013

Loews Hotels & Resorts announces major cross-portfolio upgrades

Loews Hotels & Resorts is currently in the midst of a major growth and property redesign initiative, reflecting a strong national trend in hospitality renovation. 

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 10, 2013

The new medical office building: 7 things to know about today’s outpatient clinic

Regulatory pressures, economic constraints, and emerging technologies are transforming healthcare. Learn how Building Teams are responding with efficient, appealing, boundary-blurring outpatient buildings. 

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 4, 2013

Augmented reality goes mainstream: 12 applications for design and construction firms

Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site. 

| Sep 4, 2013

Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show

Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program. 

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021