flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

citizenM’s American expansion now includes second hotel in Boston

Hotel Facilities

citizenM’s American expansion now includes second hotel in Boston

The Back Bay property is also the kickoff of a new mixed development.


By John Caulfield, Senior Editor | September 5, 2024
Exterior of citizenM Boston Back Bay hotel
citizenM's 15-story Boston Back Bay hotel is its 10th in the U.S. Images: Courtesy of citizenM

CitizenM has opened its largest hotel to date globally.

The 399-room citizenM Boston Back Bay is the brand’s second property in Boston. The 15-story 151,726-sf building was designed by citizenM’s longtime architecture partner, Concrete Amsterdam, with the Boston-based firm Elkus Manfredi Architects. CitizenM Boston Back Bay represents the brand’s 36th hotel worldwide, and continues the brand’s push into the U.S.: citizen M opened its first hotel in Austin last March, and its third Miami-area property, Miami South Beach, last month. With the Boston property, citizenM has 10 hotels in the U.S.

The Boston project’s codeveloper is Samuel & Associates, and its general contractor is Suffolk Construction. The cost of the hotel is confidential, according to the company.

Tight quarters: All of the rooms in citizenM Boston Back Bay are identical, and designed for two adults, with one extra-large bed to share. 

CitizenM promotes itself as an “affordable luxury” brand. Its hotel features wall-to-wall windows, luxury bedding and towels, and iPad room controls. The facility’s highlights include The Living Room, with books, art, designer furniture and designated workspaces; collectionM, a retail space on the first floor with travel essentials, gifts, and books; canteenM, an open-plan, grab-and-go dining area open 24 hours; a rooftop bar, a 3rd-floor gym, and one-minute check in and out.

Hotel is first step in a bigger plan

The hotel’s design team commissioned a section of the entrance façade from Maria Molteni, an interdisciplinary artist and designer.

canteenM offers 24/7 food and beverage service.

The Boston hotel is within walking distance of Fenway Park, home to the Boston Red Sox baseball team. The hotel’s opening is part of the first stage of Lyrik, a mixed-use development that includes a 450,000-square-foot lab and office space housing the CarGurus Global Headquarters and The LEGO Group, the latter of which started moving employees into this space last spring. The development is also the first Boston-based outpost for the electirc carmaker Rivian. This fall, Pink Carrot and CHICHA San Chen will join Lyrik’s lineup. By spring 2025, Lyrik will have added George Howell Coffee, Van Leeuwen Ice Cream, and the Greek restaurant Avra Estiatorio.

The hotel's “Living Room" includes designated workspaces.

Related Stories

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Hotel Facilities | Feb 16, 2021

Santa Monica Professional Building restored into a modern hotel

Howard Laks Architects designed the project.

Modular Building | Jan 26, 2021

Offsite manufacturing startup iBUILT positions itself to reduce commercial developers’ risks

iBUILT plans to double its production capacity this year, and usher in more technology and automation to the delivery process.

Daylighting | Jan 16, 2021

Daylighting system creates 'an oasis in the city' for renovated hotel in downtown Minneapolis

Solatube daylighting systems were used to bring natural light into the lobby of the Midland Bank building in Minneapolis.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Hotel Sector Giants: Top architecture, engineering, and construction firms in the U.S. hospitality sector

Gensler, Jacobs, and Suffolk Construction top BD+C's rankings of the nation's largest hotel sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

Hotel Facilities | Nov 3, 2020

Hotel made from CLT opens at Fort Jackson, S.C.

This project used over 4,100 pieces of cross-laminated timber. It's the fourth CLT hotel in the Army's housing portfolio.

Hotel Facilities | Oct 27, 2020

Hotel construction pipeline dips 7% in Q3 2020

Hospitality developers continue to closely monitor the impact the coronavirus will have on travel demand, according to Lodging Econometrics.

Smart Buildings | Oct 26, 2020

World’s first smart building assessment and rating program released

The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021