The Cincinnati Open, one of the longest-running tennis tournaments in the U.S., is undergoing a campus-wide renovation of the sports complex. The Cincinnati Open Campus Transformation aims to improve both fan and player experiences ahead of the event’s expanded 2025 tournament.
The work represents the next stage of tournament owner Beemok Capital’s $260 million investment in upgrades to help keep Cincinnati Open in its hometown for the next 25 years. This year marks the Cincinnati Open’s 125th anniversary.
The reimagined campus will feature modern stadium façades and extensive landscaping to create a park-like atmosphere. At the heart of the campus, both Center Court and Grandstand Court will get a sleek, continuous façade. A canopy-shaded fan plaza will provide more greenspace.
“When complete, the grounds will feature an increase in green space and trees. This will be paired with an updated campus aesthetic showcasing clean lines, simple, elegant forms and a fresh, neutral color palette that will beautifully complement the park-like setting,” Kristin Byrd, design director and architect, Gensler, said in a statement.
Byrd added that the design team aimed to create “an authentic sense of place by incorporating regional building materials, engaging with local artisans, and honoring the tournament’s history through layering of art and historical iconography—all with a modern twist.”
![The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament](/sites/default/files/inline-images/New%20Stadium%20at%20the%20Cincinnati%20Open%20courtesy%20Gensler_0.jpg)
To increase capacity for the expanded tournament, the project will add fan amenities, courts, and player facilities. The campus will get a new 2,000-seat sunken stadium, which will be the fourth largest of the venue’s five permanent stadiums. The stadium is one of 10 new courts, bringing the campus court total to 31.
Another addition is a 56,000-sf, two-story player center. The facility will include lounge and restaurant space for the tournament’s players and their support teams, wellness and recovery rooms for the players, and locker rooms for coaches.
Existing player facilities in the Paul Flory Player Center will be renovated to provide more locker room space and an expanded fitness center. Other planned additions include a six-court indoor facility, six pickleball courts, and two padel courts.
The 2025 Cincinnati Open Campus Transformation projects are in addition to previously announced work currently underway to upgrade the seating experience in Center Court and Grandstand Court, add four practice courts, renovate the Crosscourt Suites and Top Deck lounge areas, and create a new hospitality suite overlooking Grandstand Court.
On the Building Team:
Owner: Beemok Capital
Design architect: Gensler
MEP engineer: Smith Seckman Reid, Inc.
Structural engineer: Walter P Moore
General contractor: Barton Malow
![The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament](/sites/default/files/inline-images/F%26B%20Plaza%20at%20the%20Cincinnati%20Open%20courtesy%20Gensler.jpg)
![The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament](/sites/default/files/inline-images/Fan%20Plaza%20at%20the%20Cincinnati%20Open%20courtesy%20Gensler.jpg)
![The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament](/sites/default/files/inline-images/North%20Entry%20Plaza%20at%20the%20Cincinnati%20Open%20courtesy%20Gensler.jpg)
![The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament](/sites/default/files/inline-images/Player%20Building%20at%20the%20Cincinnati%20Open%20courtesy%20Gensler.jpg)
Related Stories
| Sep 24, 2012
$3.8-million athletic field and track opens in Glen Head, N.Y.
The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.
| Sep 7, 2012
Duffy joins Thornton Tomasetti
At Hardesty & Hanover, Duffy partnered with Thornton Tomasetti on a number of projects.
| Aug 24, 2012
Meis heads to Woods Bagot Sport
Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.
| Aug 8, 2012
Giants 300 Sports Facilities Report
BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.
| Jun 14, 2012
Minnesota Vikings stadium plan gets legislative go-ahead
Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.
| Jun 8, 2012
Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex
Casaccio Yu Architects designed the 11,300-sf fitness and social complex.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.