flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Cincinnati Open will undergo a campus-wide renovation ahead of the expanded 2025 tournament

Sports and Recreational Facilities

The Cincinnati Open will undergo a campus-wide renovation ahead of the expanded 2025 tournament

One of the longest-running tennis tournaments in the country, the Cincinnati Open will add a 2,000-seat stadium, new courts and player center, and more greenspace to create a park-like atmosphere.


By Novid Parsi, Contributing Editor  | May 23, 2024
The Cincinnati Open will undergo a campus-wide renovation ahead of the expanded 2025 tournament
Rendering courtesy Gensler

The Cincinnati Open, one of the longest-running tennis tournaments in the U.S., is undergoing a campus-wide renovation of the sports complex. The Cincinnati Open Campus Transformation aims to improve both fan and player experiences ahead of the event’s expanded 2025 tournament. 

The work represents the next stage of tournament owner Beemok Capital’s $260 million investment in upgrades to help keep Cincinnati Open in its hometown for the next 25 years. This year marks the Cincinnati Open’s 125th anniversary.

The reimagined campus will feature modern stadium façades and extensive landscaping to create a park-like atmosphere. At the heart of the campus, both Center Court and Grandstand Court will get a sleek, continuous façade. A canopy-shaded fan plaza will provide more greenspace.

“When complete, the grounds will feature an increase in green space and trees. This will be paired with an updated campus aesthetic showcasing clean lines, simple, elegant forms and a fresh, neutral color palette that will beautifully complement the park-like setting,” Kristin Byrd, design director and architect, Gensler, said in a statement. 

Byrd added that the design team aimed to create “an authentic sense of place by incorporating regional building materials, engaging with local artisans, and honoring the tournament’s history through layering of art and historical iconography—all with a modern twist.” 

The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament
Rendering courtesy MKSK

To increase capacity for the expanded tournament, the project will add fan amenities, courts, and player facilities. The campus will get a new 2,000-seat sunken stadium, which will be the fourth largest of the venue’s five permanent stadiums. The stadium is one of 10 new courts, bringing the campus court total to 31.

Another addition is a 56,000-sf, two-story player center. The facility will include lounge and restaurant space for the tournament’s players and their support teams, wellness and recovery rooms for the players, and locker rooms for coaches.

Existing player facilities in the Paul Flory Player Center will be renovated to provide more locker room space and an expanded fitness center. Other planned additions include a six-court indoor facility, six pickleball courts, and two padel courts. 

The 2025 Cincinnati Open Campus Transformation projects are in addition to previously announced work currently underway to upgrade the seating experience in Center Court and Grandstand Court, add four practice courts, renovate the Crosscourt Suites and Top Deck lounge areas, and create a new hospitality suite overlooking Grandstand Court. 

On the Building Team:
Owner: Beemok Capital
Design architect: Gensler
MEP engineer: Smith Seckman Reid, Inc.
Structural engineer: Walter P Moore
General contractor: Barton Malow

The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament
Rendering courtesy MKSK
The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament
Rendering courtesy Gensler
The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament
Rendering courtesy MKSK
The Cincinnati Open undergoes a campus-wide renovation ahead of the expanded 2025 tournament
Rendering courtesy Gensler

Related Stories

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 11, 2014

Getting to net-zero energy with brick masonry construction [AIA course]

When targeting net-zero energy performance, AEC professionals are advised to tackle energy demand first. This AIA course covers brick masonry's role in reducing energy consumption in buildings. 

| Jan 7, 2014

Concrete solutions: 9 innovations for a construction essential

BD+C editors offer a roundup of new products and case studies that represent the latest breakthroughs in concrete technology.

Smart Buildings | Jan 7, 2014

9 mega redevelopments poised to transform the urban landscape

Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country. 

| Dec 27, 2013

$1 billion 'city within a city' development approved by Coachella, Calif., city council

The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Dec 9, 2013

Tips for designing higher education's newest building type: the learning commons

In this era of scaled-down budgets, maximized efficiencies, new learning methods and social media’s domination of face time, college and university campuses are gravitating toward a new space type: the learning commons.

| Dec 4, 2013

First look: Dubai's winning bid for World Expo 2020 [slideshow]

Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.

| Dec 3, 2013

Historic Daytona International Speedway undergoing $400 million facelift

The Daytona International Speedway is zooming ahead on the largest renovation in the Florida venue’s 54-year history. Improvements include five redesigned guest entrances, an extended grandstand with 101,000 new seats, and more than 60 new trackside suites for corporate entertaining.

boombox1
boombox2
native1

More In Category



Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021