The Collaborative for High Performance School (CHPS) released the 2016 CHPS PreFABTM Criteria and Program.
The program provides a streamlined process for pre-approving prefabricated modular classroom models that meet CHPS’s Criteria rating system for healthy, high performance schools. CHPS says that the Gen7 24x40 foot model is the first to successfully complete the new CHPS PreFAB pre-approval process.
Classrooms earning this designation meet standards related to indoor environmental quality, energy efficiency, materials, waste management and other sustainable attributes. CHPS PreFAB Pre-Approval is available for individual buildings that include: single or multiple classrooms, one or more stories, permanent construction or re-locatable, have independent HVAC systems, are pre-wired and, if applicable, are pre-plumbed.
The CHPS PreFAB program was revised by a subcommittee of the CHPS National Technical Committee. The subcommittee was composed of representatives from manufacturers, schools, and other stakeholders.
Related Stories
AEC Innovators | Aug 13, 2019
Stacking the deck: Marriott International embraces modular construction
The hotel giant has more than 50 projects in the works that incorporate prefab guestrooms or bathrooms.
Modular Building | Jul 3, 2019
World’s tallest modular building rises in Singapore
The state has been pushing for improvements in construction management.
Modular Building | May 13, 2019
This Marriott is poised to take over the title as the world’s tallest modular hotel
Danny Forster & Architecture designed the building.
Sponsored | Modular Building | Jan 22, 2019
Folsom Hotel opens five months early using modular construction
Early check in? With modular construction the answer is yes!
Modular Building | Oct 31, 2018
Europe’s citizenM is trying to crack into the U.S. hotel market with steel-framed modular construction
Projects in several cities are in various stages of development.
Modular Building | Oct 12, 2018
DeSimone Consulting Engineers designs the tallest modular hotel in the United States
The hotel was originally designed as a cast-in-place concrete structure.
Modular Building | Sep 25, 2018
Amazon invests in a prefab module supplier
Los Angeles-based Plant Prefab targets single- and multifamily construction.
Modular Building | Aug 6, 2018
More contractors are turning to offsite production for speed and quality
Skender launches an advanced manufacturing division. Katerra ups its bet on modular. Prefabrication comes to the rescue on multiple projects.
Modular Building | Aug 2, 2018
Educare Center in Long Beach uses modular construction to cut costs without sacrificing space or amenities
Dougherty was the Architect-of-Record.
Modular Building | Jul 23, 2018
Offsite construction: Why it’s important for the survival of your firm
The industry is approaching its “heart attack moment,” with so many large projects that are chronically late, over budget, and unprofitable, writes FMI Capital Advisors’ Michael Swistun.