flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chipperfield's sparkling brass-clad scheme selected to be new home of Nobel Prize

Chipperfield's sparkling brass-clad scheme selected to be new home of Nobel Prize

The distinctive building, with its shimmering vertical brass elements and glass façade design, beat out two other finalists in the Nobel Center architectural competition.


By Nobel Center | April 15, 2014
David Chipperfield Architects has won the Nobel Center architectural competition
David Chipperfield Architects has won the Nobel Center architectural competition. Renderings: courtesy Nobel Center, David Chipp
A unanimous competition jury has selected David Chipperfield’s and Christoph Felger’s slender brass-clad building as the winner in the Nobel Center architectural competition. 
 
“We are extremely excited and honoured to have been selected to be the architects for the Nobel Center. We look forward to working together to develop a building that reflects both the values of the Nobel Prize and the high expectations of the citizens of Stockholm,” says architect David Chipperfield.
 
According to the statement of the jury, the proposed building has an elegant, timeless and attractive external appearance with a clear identity of its own. The revised façade design, with its shimmering vertical brass elements and glass, has a lofty elegance and quality that can be associated with the Nobel Prize.
 
“The jury finds the lightness and openness of the building very appealing and consistent with the Nobel Foundation’s explicit ambition to create an open and welcoming Center for the general public,” says Lars Heikensten, chairman of the competition jury and Executive Director of the Nobel Foundation.
 
The transparent ground floor helps create a pleasant setting in the immediate vicinity of the building, thereby also enriching the urban public space. Meanwhile the building’s moderate footprint creates good opportunities for a public city park in a sunny south-east position.
 
The jury is of the opinion that after additional refinement in collaboration with the client and with public authorities, the proposal can lead to a dignified, exciting and inviting Nobel Center building while helping create a better, more engaging and beautiful urban setting on the Blasieholmen peninsula in central Stockholm.
 
Per Wästberg, writer, member of the Swedish Academy, Chairman of the Nobel Committee for Literature and one of the members of the competition jury says, “We view the winning proposal as a concrete interpretation of the Nobel Prize as Sweden’s most important symbol in the world. Stockholm will gain a building – magnificent but without pomp, powerful yet graceful – with qualities like those the City Hall gave the capital a century ago.”
 
In the now-completed second stage of the competition, the jury assessed proposals from three finalists: David Chipperfield and Christoph Felger från David Chipperfield Architects Berlin (Germany), Johan Celsing from Johan Celsing Arkitektkontor (Sweden) and Gert Wingårdh from Wingårdh Arkitektkontor (Sweden).
 
The Nobel Center will build up its activities around the Nobel Prize’s unique combination of disciplines – sciences, literature and peace. The ambition is to make the Nobel Center one of Stockholm’s most attractive destinations, including public spaces for exhibitions, programme and school activities, events and interdisciplinary meetings of various kinds.
 
Take a look at the renderings that won the competition:
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects

Related Stories

| Jun 13, 2013

AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition

The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York. 

| Jun 12, 2013

More than 90% of New York City schools have code violations

More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.

| Jun 12, 2013

5 building projects that put the 'team' in teamwork

The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team. 

| Jun 12, 2013

Sacred synergy achieves goals for religious education [2013 Building Team Award winner]

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.

| Jun 12, 2013

‘Talking’ Braille maps help the visual impaired

Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.

| Jun 11, 2013

Music/dance building supports sweet harmony [2013 Building Team Award winner]

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021