Much like OMA's daring design scheme for the CCTV Headquarters building, China's latest skyscraper, Guanghzou Circle, is meant to break away from the traditional skyscraper design ethos of the west—and it does so in dramatic fashion.
The 452-foot-tall, 914,000-sf building takes the shape of a giant doughnut, or more accurately described, a super-sized ribbon spool, with the floor space housed in a series of boxes suspended between two massive "wheels."
The project's architect, Milan-based Joseph di Pasquale Architect, drew inspiration from China's numerological tradition of feng shui, namely the jade bi-disk, which served as the royal symbol of the ancient Chinese dynasty that reigned in the area some 2,000 years ago. The architect describes the form as "an 'urban logo' that works as a reference in the panorama of the city, just as the characters are used instead of the alphabet in Chinese writing."
The interior houses office space and a trading floor for the Guangdong Plastics Exchange, the country's largest plastics trading floor, where some £30 billion worth of plastic raw materials and goods are traded annually, according to Sky News.
Related Stories
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.
| May 23, 2012
Gifford joins Perkins Eastman as principal
Design and planning expertise in science, technology, education, and healthcare.
| May 23, 2012
McRitchie joins McCarthy Building as VP, commercial services in southern California
McRitchie brings more than 18 years of experience in the California construction marketplace.
| May 23, 2012
Arizona Army National Guard Readiness Center awarded LEED Silver
LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.