flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

China's largest single-phase hospital planned for Shanghai

China's largest single-phase hospital planned for Shanghai


September 13, 2010
This article first appeared in the September 2010 issue of BD+C.

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase. The 3.9 million-sf facility will have 2,200-beds in four inpatient towers, a VIP patient tower, an outpatient center, an emergency center, and an infectious disease building. The $413 million facility will also include research and teaching facilities, dormitories for students and staff, an administration building, and a conference and reception facility.

Related Stories

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Cultural Facilities | Apr 7, 2015

Mies’ Martin Luther King Jr. Library to get makeover

The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”

Cultural Facilities | Apr 6, 2015

Berkeley’s West Branch Library generates more energy than it uses

The 9,400-sf facility is California's first Net Zero Energy-certified building.

Codes and Standards | Apr 6, 2015

Industry groups petition for change order reform on federal projects

Nine design and construction associations ask for assurance that funds available for additional work.

High-rise Construction | Apr 6, 2015

Melbourne tower will light up depending on weather

The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology. 

BIM and Information Technology | Apr 3, 2015

French startup develops drone camera that overlays video with 3D images

The new drones can capture video and overlay the shot results with 3D images and augmented reality remotely.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021