In early December, Liu Zhangning was tending her cabbage patch when she saw a tall yellow construction crane in the distance. At night, the work lights made it seem like day.
Fifteen days later, a 30-story hotel towered over her village on the outskirts of the city like a glass and steel obelisk.
"I couldn't really believe it," Liu said. "They built that thing in under a month."
A time-lapse video of the project in Changsha, which shows the prefabricated building being assembled on site, has racked up more than 5 million views on YouTube and left Western architects speechless.
"I've never seen a project go up this fast," said Ryan Smith, an expert on prefabricated architecture at the University of Utah.
In other countries, the most advanced prefab construction methods can reduce building times by a third to half, Smith said. The builders of the Changsha hotel did better, knocking one-half to two-thirds off the normal schedule.
"It's unfathomable," Smith said.
The warp-speed construction is a startling illustration of the building boom in China, where an exodus from the countryside to the cities has swelled the urban population by almost 400 million since 1990.
Click here to read more and to view a time lapse video of the construction. BD+C
Related Stories
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRM 2011: Chapman Construction/Design
Taking sustainable practices to heart.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.
| Dec 8, 2011
Keast & Hood Co. part of Statue of Liberty renovation team
Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty.