A meeting of 52 key Chinese and international architecture and planning firms yielded the China Accord—a pledge to cooperatively lower carbon emissions in the built environment.
The meeting was hosted by the China Exploration and Design Association – Architecture Branch (CEDAAB) and by Architecture 2030. “We understand our moral and professional responsibility to address the issue of greenhouse gas emissions if we are to stay within the 2° C threshold established by the international scientific community, and the Accord is just the beginning of our joint efforts,” said Ed Mazria, Architecture 2030 Founder and CEO. “We have a long and exciting road ahead of us to decarbonize the built environment.”
The China Accord supports the Chinese government’s targets to peak and begin reducing carbon emissions, as well as the State Council’s Green Buildings Action Plan and the recent China-US Joint Presidential Statement on Climate Change. A number of initiatives will result from the Accord, including professional training, knowledge-sharing events and programs, a broad-based stakeholders’ forum, and the localization of design and planning strategies utilizing real-time simulation tools.
Among the international firm signatories were DLR Group, Skidmore Owings & Merrill, ARUP, Gensler, CallisonRTKL, HKS Architects, Perkins+Will, HDR, and Glumac.
Related Stories
| Oct 4, 2011
GREENBUILD 2011
Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.
| Oct 4, 2011
GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle
Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.
| Oct 4, 2011
GREENBUILD 2011: Johnsonite features sustainable products
Products include rubber flooring tiles, treads, wall bases, and more.
| Oct 4, 2011
GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced
Low insulation value reflects value of entire curtain-wall system.
| Oct 4, 2011
GREENBUILD 2011: Ready-to-use wood primer unveiled
Maintains strong UV protection, clarity even with application of lighter, natural wood tones.
| Oct 4, 2011
GREENBUILD 2011: Two new recycled glass products announced
The two collections offer both larger and smaller particulates.
| Oct 4, 2011
GREENBUILD 2011: Mythic Paint launches two new paint products
A high performance paint, and a combination paint and primer now available.
| Oct 4, 2011
GREENBUILD 2011: Wall protection line now eligible to contribute to LEED Pilot Credit 43
The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.