flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago’s West Loop to receive 500-foot apartment tower

High-rise Construction

Chicago’s West Loop to receive 500-foot apartment tower

The 44-story tower will provide 492 rental units and a retail podium.


By David Malone, Associate Editor | January 31, 2017

Rendering courtesy of FitzGerald Associates Architects

Just over one week ago, a Chicago apartment tower project that was revealed in 2011 and approved by the city the following year finally received a construction permit.

According to Curbed Chicago, the cylindrical tower, dubbed One South Halsted, will rise 44-stories and 495 feet in the air and become the tallest building in Chicago west of the Kennedy Expressway.

One South Halsted will replace the Crowne Plaza’s surface lot in Greektown. A new 375-spot parking garage, scaled down from earlier plans that called for 520 spaces, will be shared between the building’s residents and guests of the Crowne Plaza. In addition to the parking spots that were eliminated, a ballroom connecting to the existing hotel via an elevated bridge has also been removed from the original proposal.

The entire building measures just under 800,000 sf. 9,500 sf of that space will be set aside for ground floor retail. A total of 30,710 sf is designated for office and retail combined. 492 rental apartments, and associated amenities, will occupy the rest of the space. The recently approved construction permit lists the project’s cost at $136 million and covers foundation and structural-only work through the seventh floor.

The project is being co-developed by Fifield Companies and F&F Realty. FitzGerald Associates Architects is the architect for the project while Lendlease will be the general contractor.

 

Rendering courtesy of FitzGerald Associates Architects.

Related Stories

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 10, 2012

Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo

Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.

| Apr 6, 2012

Flat tower green building concept the un-skycraper

A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.

| Apr 4, 2012

Bald joins the Harmon glazing team

Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.

| Apr 2, 2012

Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper

The operation of the elevator is scheduled to begin in 2014.

| Mar 27, 2012

Bank of America Plaza becomes Atlanta's priciest repo

Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021