flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago’s first indoor track and field facility features a hydraulically banked track

Sports and Recreational Facilities

Chicago’s first indoor track and field facility features a hydraulically banked track

It is the first hydraulically banked track in Illinois.


By David Malone, Managing Editor | July 7, 2021
Gately Park track
Gately Park track

A new $53.67 million Indoor Track & Field Facility at Gately Park has completed construction in Chicago’s Pullman neighborhood.

The 139,375-sf building features a 118,000-sf field house that includes a 200-meter, six-lane running track; high jump and long jump pits; pole vault, hurdle, and relay areas; throw cages; sprint lanes; concession areas; locker rooms; and seating for 3,500 spectators. 

The remaining 22,000 sf includes a fitness center, multipurpose rooms for community use, Chicago Park District administrative offices, and After School Matters programming space. The After School Matters area, which was designed by Eckenhoff Saunders Architects, includes a dance and exercise studio, a full culinary teaching kitchen, gathering/performance space, a rooftop deck and garden, and multipurpose labs for art, music, science, and technology. The flexible design allows the space to convert to multiple athletic purposes and can accommodate four basketball and six volleyball courts.

 

Gately Park Teaching Kitchen

 

The facility’s main feature is its oval track that can be banked to eliminate the centrifugal force that makes athletes lean one way or the other, allowing them to achieve their top speed. The track’s interior lane rests on a pivot and the support system underneath rests on hydraulic cylinders that are part of the actuator system that makes it possible to bank the track for a race. Depending on the length of the race, the track has as many as six preset banking angles. When not in use, all of the track’s lanes lay flat so the space can be used for additional recreation.

 

Gately Park Exterior

 

The building also features a column-free design as to not interfere with track and field events, which meant the fieldhouse roof was constructed with six massive, 252-foot-by-20-foot-deep barrel-vaulted, 120-ton roof trusses that span the entire width of the space.

In addition to Williams Architects, the build team also included McHugh Construction and Bowa Construction.

 

Gately Park banked track

Related Stories

Building Team Awards | May 23, 2016

'Greenest ballpark' proves a winner for St. Paul Saints

Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.

Sports and Recreational Facilities | May 20, 2016

Texas Rangers announce plans for $1 billion retractable roof ballpark

The new stadium will replace Globe Life Park, which is only 22 years old.  

Sports and Recreational Facilities | May 19, 2016

Audacy brings wireless lighting controls to Wrigley Field’s new clubhouse

The Audacy system uses a combination of motion sensors, luminaire controllers, light sensors, and switches that are all connected and coordinated by Gateways.

Sports and Recreational Facilities | May 6, 2016

NBA’s Atlanta Hawks to build new practice center with attached medical facilities

The team will have easy access to an MRI machine, 3D motion capture equipment, and in-ground hydrotherapy. 

BIM and Information Technology | May 2, 2016

How HDR used computational design tools to create Omaha's UNO Baxter Arena

Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.

Mixed-Use | May 1, 2016

A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas

Construction will soon begin on housing, retail, and office spaces.

Sports and Recreational Facilities | Apr 17, 2016

An expanded and renovated complex brings together U. of Colorado’s sports programs

This two-year project enhances the experiences of athletes and fans alike.

Sports and Recreational Facilities | Apr 13, 2016

Cubs take a measured approach when planning HD video boards

Along with the mammoth and super-sharp video boards, Wrigley Field's 1060 Project includes renovated bleachers, upgraded player amenities, and more concourses, decks, and concessions.

Sports and Recreational Facilities | Apr 13, 2016

More than a game: 4 ways sports teams are adapting to changing fan preferences

As the cost of tickets, parking, and concessions skyrockets, while home theater technology becomes more affordable, fans wonder: Why even bother going to the game? Here’s how progressive sports owners and Building Teams are packing stadium seats.

Sports and Recreational Facilities | Apr 11, 2016

Chicago Cubs continue Wrigley Field renovations with new clubhouse

The team found 30,000 sf of space underneath an old parking lot, nearly tripling the size of the old clubhouse. 

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021