flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago’s Bank of America Tower completes, opens

Office Buildings

Chicago’s Bank of America Tower completes, opens

Goettsch Partners designed the project.


By David Malone, Associate Editor | October 14, 2020
Bank of America Tower exterior

Photos courtesy Bank of America

At 56 stories, Bank of America Tower is the tallest commercial building to be added to the Chicago skyline in the last 30 years. 

Designed by Goettsch Partners, the 1,770,000-sf tower includes a stepped center core, which allows for a 45-foot lease span on each side. Interior space planning is enhanced by the five-foot setbacks along the river, providing the equivalent of 14 corner offices. The setbacks create a distinctive form that accentuates the building’s verticality and avoids the pure box-like appearance typical of many office towers.

 

Bank of America Tower Market Cafe

 

A 45-foot-high lobby is enclosed by a cable-supported glass wall, and sculpted, folded-limestone cladding covers the elevator cores. The transparency of the low-iron glass wall eliminates the distinction between the interior space of the lobby and the exterior space of the streetscape.

Other building features include an Advanced Financial Center on the lobby floor that features a modern banking experience with interactive digital technology, ATMS, and videoconferencing capabilities; a two-story, 16,000-sf fitness center; and a Riverwalk cafe to be operated by Gibson’s Restaurant Group.

2,600+ Bank of America employees occupy 17 floors and 536,278 sf across the LEED Gold certified tower. Goettsch Partners designed the building. Nelson Worldwide completed the interiors and interior amenity spaces.

 

Bank of America Tower signage

Related Stories

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 3, 2011

Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

| Sep 28, 2011

Opus Group awarded contract for new Church & Dwight Co. headquarters

The campus will include two 125,000-sf Class A, energy-efficient office buildings that will be designed and constructed with sustainable practices and elements. 

| Sep 26, 2011

Copper helps serve and protect Lightning Alley

Copper grounding upgrades add protection and reliability to Florida Sheriff's Department.

| Sep 23, 2011

Smart windows installed at NREL

The self-tinting heat-activated filter allows solar heat into the building when it is desired, such as on a sunny winter day. 

| Sep 23, 2011

Wall Street adage proving true for the office market

Sale prices for office buildings enjoyed a moderate bounce to the upside, following the financial crisis of 2007 - 2008. 

| Sep 20, 2011

Francis Cauffman wins two IDA design awards

The PA/NJ/DE Chapter of the International Interior Design Association (IIDA) has presented the Francis Cauffman architecture firm with two awards: the Best Interior Design of 2011 for the W. L. Gore offices in Elkton, MD, and the President’s Choice Award for St. Joseph’s Regional Medical Center in Paterson, NJ.

| Sep 16, 2011

Electrical installation work completed at Rhode Island DMV

The facility was renovated in order to better the working environment for DMV employees and streamline the experience for Rhode Island drivers.

| Sep 14, 2011

USGBC L.A. Chapter's Green Gala features Jason McLennan as keynote speaker

The Los Angeles Chapter of the nonprofit USGBC will launch its Sustainable Innovation Awards this year during the chapter's 7th Annual Green Gala on Thursday, November 3.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021