flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago Bears kick off season at renovated Halas Hall

Chicago Bears kick off season at renovated Halas Hall

Mortenson Construction completed the expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., in less than seven months.


By Mortenson Construction | August 26, 2013

An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months, the time between National Football League seasons.

“Despite the very tight turnaround, Mortenson has done a first-class job from start to finish,” says John Bostrom, vice president of business administration for the Chicago Bears. “They put in long hours, successfully working around our staff and coaches who continued to use the facility during construction, and completed all of the improvements in time for the team to take full advantage of them this season.”

The renovation has enhanced both player and business facilities, including the addition of a world-class broadcasting center that has already enabled the Bears to launch a new weekly television program. “With the expansion and upgrades, the Bears organization has strengthened its competitiveness on and off the field with state-of-the-art resources for players, coaches and staff,” says Greg Werner, vice president and head of the Chicago office of Mortenson Construction.

Mortenson expanded Halas Hall by more than 43,000 square feet to a total of 143,350 square feet. As part of the renovation, it enlarged the weight room and training room while installing new lighting, lockers, and carpeting in the locker room. Mortenson added offices and conference rooms with upgraded technology as well as a viewing suite overlooking the team’s practice fields.

 

 

A new event center includes a 4,000-square foot broadcast studio and conference center, new press conference room and additional work space for media. At the event center, the Bears are putting the finishing touches on a special interactive space featuring team information and memorabilia, including some never-before-featured pieces of Bears history such as the 1963 NFL championship trophy.

Mortenson drew on extensive experience, having built more than 100 sports and event centers totaling more than $4 billion, for the Halas Hall project.

 

About Mortenson Construction
Founded in 1954, Mortenson Construction is a U.S.-based, privately held construction company.  As one of the nation's top builders, Mortenson provides a complete range of services, including planning, program management, preconstruction, general contracting, construction management, design-build, and development. With a local office in Chicago, Mortenson has additional offices in Minneapolis, Denver, Milwaukee, Phoenix, Seattle and international operations in Canada and China. 

Related Stories

| Aug 16, 2022

Cedars-Sinai Urgent Care Clinic’s high design for urgent care

The new Cedars-Sinai Los Feliz Urgent Care Clinic in Los Angeles plays against type, offering a stylized design to what are typically mundane, utilitarian buildings. 

| Aug 15, 2022

IF you build it, will they come? The problem of staff respite in healthcare facilities

Architects and designers have long argued for the value of respite spaces in healthcare facilities.

| Aug 15, 2022

Boston high-rise will be largest Passive House office building in the world

Winthrop Center, a new 691-foot tall, mixed-use tower in Boston was recently honored with the Passive House Trailblazer award.

Architects | Aug 12, 2022

Goettsch Partners names James Zheng, CEO, and Paul de Santis, Co-design Director

Global architecture firm Goettsch Partners (GP) announces that James Zheng, AIA, LEED AP, has been named CEO, and Paul De Santis, Assoc. AIA, LEED AP, joins James Goettsch, FAIA, as co-design directors for the practice. As the primary partners in the firm, the three have worked closely together for more than 17 years. Goettsch will also continue to serve as chairman while Zheng now assumes the full CEO title as well as president.

| Aug 12, 2022

Monthly Construction Input Prices Decreased 2% in July, Up 17% From a Year Ago, Says ABC

Construction input prices decreased 1.8% in July compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics’ Producer Price Index data released today.

Hotel Facilities | Aug 12, 2022

Denver builds the nation’s first carbon-positive hotel

Touted as the nation’s first carbon-positive hotel, Populus recently broke ground in downtown Denver.

| Aug 11, 2022

Report examines supposed conflict between good design and effective cost management

A report by the American Institute of Architects and the Associated General Contractors of America takes a look at the supposed conflict between good design and effective cost management, and why it causes friction between architects and contractors.

Architects | Aug 11, 2022

Mancini Duffy Bill Mandara on expanding through diversification

In this segment for HorizonTV, BD+C's John Caulfield interviews Mancini Duffy's CEO and Co-owner William Mandara about his firm's recent growth, which includes an acquisition and new HQs office.

Energy Efficiency | Aug 11, 2022

Commercial Energy Efficiency: Finally “In-the-Money!”

By now, many business leaders are out in front of policymakers on prioritizing the energy transition.

High-rise Construction | Aug 11, 2022

Saudi Arabia unveils plans for a one-building city stretching over 100 miles long

Saudi Arabia recently announced plans for an ambitious urban project called The Line—a one-building city in the desert that will stretch 170 kilometers (106 miles) long and only 200 meters (656 feet) wide.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021