flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cherokee County Detention Center renovation completes

Government Buildings

Cherokee County Detention Center renovation completes

CROFT designed the project.


By David Malone, Managing Editor | February 16, 2022
Cherokee Adult Detention Center exterior
All photos: Jason Buch

The 225,000-sf Cherokee County Adult Detention Center was first completed in 2002, but has recently undergone a renovation project that included the addition of more than 110,000-sf of space to keep up with the county’s growing needs.

Through the expansion, the Center acquired a 582-bed housing tower composed of precast concrete modular cells with structural precast walls and floors, a load bearing CMU, and elevated cast-in-place concrete. 21-day rooms were specially designed for indirect supervision from elevated control towers and three exercise yards. Additional renovations took place in the kitchen, staff dining area, laundry facilities, visitation areas, the lobby, and the master control.

Cherokee Adult Detention Center inmate cell

The existing kitchen was expanded to accommodate the increased number of meals needing to be prepared. The staff dining area was given improved finishes to create a more pleasing environment. The main control room was modified to increase the monitoring capabilities of the Sheriff’s staff to view all movement within the detention center.

Several previously unused areas were reinstated, including the original main detention entrance that had been unused for years by staff and the public. The area was renovated and modified to become the new video visitation site, creating a safe and efficient way for visitors to speak with inmates.

Cherokee Adult Detention Center secure pod area

New public restrooms for visitors, a secure control station for the Sheriff’s staff to monitor visitor activities, 29 video visitation stations, space for 22 additional monitors, and six private attorney video visitation booths were also added.

CROFT provided the architectural design and construction administration services for the renovation/new service areas for the project. CROFT also served as a partner to Studio 8 for the housing pod addition and served as the construction administration lead for the 117,000 sq. ft., 600 bed addition to the Cherokee County Jail.

Related Stories

| Sep 7, 2012

Manhattan Construction Co. to build Fairfax office building

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.

| Aug 9, 2012

DMR Architects converts bank building to municipal court

The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.

| Aug 7, 2012

How to win more state and local government projects

With a huge building stock at their disposal, state and local governments can be attractive clients, especially in these difficult economic times.

| Aug 1, 2012

CFSI ranked among Top 10 Mechanical Contractors in D.C.

Included in the Washington Business Journal list for the second year running.

| Jul 25, 2012

Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.

Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 19, 2012

AEC firms ready to dive into public projects

But the size of the pool keeps shrinking for the Top 25 AEC firms in the Government Sector.

| Jun 28, 2012

Federal applications of renewable energy

U.S. Army Fort Knox: Using the Earth for space heating and cooling. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) facilitates the Federal Government’s implementation of sound, cost-effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

| Jun 27, 2012

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.

| Jun 19, 2012

Energy and Commerce Departments Announce New Centers for Building Operations Excellence

Part of Better Buildings Initiative, Centers Will Focus on Energy Efficiency Workforce Development for Building Operations Professionals

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021