flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chapman Construction/Design: ‘Sustainability is part of everything we do’

Chapman Construction/Design: ‘Sustainability is part of everything we do’

Chapman Construction/Design builds a working culture around sustainability—for its clients, and for its employees.


By By Tim Gregorski, Senior Editor | January 31, 2012
Chapman Construction/Design, based in Newton, Mass., takes pride in its close-kn
Chapman Construction/Design, based in Newton, Mass., takes pride in its close-knit, team-oriented culture.
This article first appeared in the February 2012 issue of BD+C.

Inspiration. It can occur in the strangest of places and often when it’s least expected. For John C. Hall, the 55-year-old CEO of Chapman Construction/Design, Newton, Mass., inspiration struck him atop a ladder, nearly 30 years ago.

In 1982, his business, then known as John C. Hall Construction, was purely a means for Hall to pay living expenses and tuition as he studied for his BArch in the night program at what is now the Boston Architectural College. Ultimately, his goal was to grow the company into a successful design-build firm that specialized in sustainable construction.

“I remember being up on a ladder that day and thinking that if I ever grew this company in the way I envisioned, I wouldn’t want it to be directly associated with me by name,” says Hall.

By 1984, Hall’s ladder-top inspiration had come to fruition as Chapman Construction/Design, which is based on Hall’s middle name. Nearly 28 years later, the company has grown to more than 50 employees and completed hundreds of construction projects. More to the point, Chapman has become one of the nation’s leading sustainable construction firms, which is one of many reasons why Building Design+Construction has recognized Chapman as a “Best AEC Firm to Work For.”

Sampling Chapman’s benefits

  • $250 annual allowance for work clothing for all employees
  • $500 annual tool allowance for field staff
  • The Battle Buddy mentor program, in which a senior staffer is assigned to a younger field-based employee to offer personal guidance and professional development
  • Vehicle reimbursement and priority parking at the Chapman offices for employees using hybrid vehicles
  • “Personal Growth Sabbatical” for employees who have been at the company more than 10 years—some have used this time for volunteer work in Africa and Hawaii.

More than half of Chapman’s 55 employees have been with the company for more than 10 years.

COMMITTED TO SUSTAINABLE CONSTRUCTION PRACTICES
In the early years, Chapman grew its client base by word of mouth, repeat business, and a reputation for excellence. Hall wanted the business to grow by pursuing the kind of projects that fit the business model. He took a pass on opportunities for growth that were simply for the sake of growth.

In the intervening years, the company has built a solid client base: 70% of the firm’s work consists of commercial interior work for corporate, educational, and medical/biotech clients; 20% supports area nonprofit organizations and institutional clients; and the remaining 10% involves consulting clients in the LEED rating system, building performance, and renewable energy.

Led by Hall and vice presidents John Ferreira, Bob D’Amico, and Rich Elliott, the firm’s 55 employees, from the president to site supervisors to office staff, are committed to implementing the most advanced environmental sustainable construction practices in the AEC industry. Operating under a team approach is a philosophy that Hall says guides the firm’s dedication to sustainability at all stages of the construction process. “Sustainability isn’t something you can just dabble in,” says Richard Elliott, a Chapman vice president. “To be successful, it has to become a mindset that everyone on the team shares. We’re lucky to have a staff here that not only understands that but is enthusiastic about it, making sustainability part of everything we do.”

In 2009 Chapman renovated its own two-story, 17,000-sf headquarters, which received the U.S. Green Building Council’s LEED-CI Platinum rating. “We use the building as a teaching tool with our clients and other industry partners, as well as students and the local community,” says Hall.

INTEGRATING PROFESSIONAL GROWTH, DEDICATION, AND DEVELOPMENT
An integral part of Chapman’s success has been the professional development and continuing education of employees. The firm provides quarterly industry-specific seminars on building science, innovative methods and materials, and LEED training.

“The dedication of our employees and our companywide commitment to sustainability has been a major differentiator from the competition,” says Hall.

Currently, 26 of the 55 Chapman staff members have earned LEED accreditation.

“It’s an exciting, progressive place to work with a close-knit culture,” says Hall. Every Chapman employee has the opportunity for personal and professional growth. Chapman’s key business ideas and initiatives are driven by nine Working Groups and focus on:

  • Building Science and Education
  • Client Relations
  • Corporate Management
  • Field Operations and Safety
  • Human Resources
  • Marketing
  • Project Management Process
  • Subcontractor Development
  • Technology

The Working Groups, which range in size from five to 10 members, consist of a diverse cross section of staff, including senior management, field staff, and new employees. The goal is to encourage the employees’ sense of ownership so they can see their ideas develop from conception to implementation.

“The Working Groups have been a win-win for Chapman and its employees,” says John Ferreira, senior vice president of construction. “The groups provide a venue for everyone to share ideas, and the company benefits from having so many people thinking about how to improve our business, whether by streamlining an existing process or developing a new program.”

It is from these Working Groups that many of the employee benefit programs have evolved.

SUBCONTRACTORS SUBJECTED TO CHAPMAN’S STANDARDS
Chapman’s relationship with its subcontractors is providing positive results on the job site. “An increasing number of clients are seeing the value in having a construction manager involved early in the process, as well as the benefits of transparency and true collaboration among the team members,” says Hall.

Click here to see a video on Chapman’s clients appreciate the firm’s team-first approach. 

In order to work for Chapman, subcontractors are subject to a detailed application process. Subcontractors that exceed Chapman’s expectations qualify for inclusion in Chapman’s Subcontractor Phonebook, which currently lists more than 2,000 subs.

Once the job is completed, Chapman puts the subcontractors through a rigorous review and evaluation. The goal is two-fold: first, to give Chapman’s project managers detailed information on the subcontractors for reference on future contracts; and, second, to provide the subs critical information they can use to operate their companies more efficiently.

“We have many dedicated and respected subs that we work with again and again,” says Hall. “We even have a Working Groupfocused entirely on our relationships with our subs, constantly evaluating them and providing constructive feedback.”

The Subcontractor Phonebook record so far: less than 1% turnover, and many subcontractors have been used repeatedly.

CHAPMAN’S OFFICE
a showcase of sustainable strategies

In 2010, Chapman Construction/Design self-performed the LEED-CI Platinum renovation of its two-story, 17,000-sf headquarters in Newton, Mass.—at the time, only the third LEED Platinum project in Massachusetts. Chapman CEO John Hall envisioned the office reconstruction as a showcase of cost-effective sustainable strategies that the firm uses to educate clients and partners.
Guy Compagnone, Chapman’s director of sustainable practices, says implementing green strategies in the firm’s own offices gives Chapman the opportunity to show clients a wide range of products. “It gives them a real sense of how different strategies might work in their own spaces, and it allows us to zero in on the most practical and cost-effective measures,” he says.
A 47-kW photovoltaic system satisfies more than 90% of the company’s electrical demands. Other factors contributing to the LEED Platinum status:

  • Improved building envelope
  • Window filming to reduce cooling load
  • Overhanging solar array that doubles as a shade awning, cutting solar heat gain
  • White roof with vegetated sections to reduce cooling load
  • Gas-powered furnace and high-efficiency condenser to replace inefficient HVAC system
  • Solar thermal system that provides domestic hot water
  • Tubular skylights to increase daylighting
  • High-efficiency plumbing and lighting fixtures to reduce water and energy consumption

They cut the number of light fixtures by 40%. The remaining fixtures were replaced with high-efficiency lamps and ballasts, bringing the office lighting load to 35% below ASHRAE standards. Water consumption has been reduced to 60% below ASHRAE standards.
Chapman estimates the firm is saving as much as $20,000 a year on electricity. The total retrofit investment is expected to be paid back within five years. 
The Massachusetts Department of Energy Resources has recognized Chapman’s office building as the first near-net-zero commercial building in the Commonwealth.

WORKING FOR CHAPMAN ON THE JOB SITE
For every project, Chapman recommends sustainable alternatives to meet or exceed LEED standards. Chapman selects and utilizes materials that are high in recycled content, including drywall and acoustic ceiling tiles. Specified paints, sealants, and adhesives contain low or no volatile organic compounds. Chapman also explores every avenue and opportunity for rebates, grants, and tax incentives associated with efficiency upgrades incorporated into the work.

Safety is of critical importance to Chapman. The firm recently submitted its Work-Related Injuries and Illnesses summary to OSHA on the heels of more than 117,000 man-hours in 2011. “We had zero recordable incidents or illnesses for the year,” says Hall. “We attribute this success to our comprehensive safety program and our outstanding employees, who go above and beyond to ensure that safety is the top priority on all job sites.”

CHAPMAN AWAY FROM THE OFFICE
Life outside the office is important to Chapman employees. The close-knit Chapman employees spend time together away from the office several times a year for team building and social activities.

An employee favorite is the Bill Rich Memorial Challenge. The annual summer fishing trip and picnic honors the late Bill Rich, a much-loved Chapman supervisor who passed away in 2009. Other team-building events include the “Ode to Summer” cookout every September at the Chapman offices.

Chapman is also dedicated to supporting the next generation of engineers and construction professionals. The firm awards a $2,000 annual scholarship to a student at Boston’s Wentworth Institute of Technology and the Minuteman Career & Technical High School, Lexington, Mass.

“Our partnership with Chapman is truly a model for collaboration between higher education and industry,” says Wentworth president Dr. Zorica Pantic. “The Chapman Construction/Design Sustainability Scholarship Program will make a difference in the lives of students and help to further the studies of sustainability.”

CONSTRUCTION INDUSTRY REACHING FOR THE NEXT RUNG
As for the future of the construction industry, Hall says he believes it will progress well beyond the sustainable practices currently employed by the industry. “I think we’re already seeing that green thinking and sustainable practices are becoming more and more expected,” says Hall. “Over the next decade, they will become standard practice, and new approaches and technologies are going to make construction exponentially more efficient than it is today.” +

Related Stories

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

| Feb 11, 2011

Grocery store anchors shopping center in Miami arts/entertainment district

18Biscayne is a 57,200-sf urban retail center being developed in downtown Miami by commercial real estate firm Stiles. Construction on the three-story center is being fast-tracked for completion in early 2012. The project is anchored by a 49,200-sf Publix market with bakery, pharmacy, and café with outdoor seating. An additional 8,000 sf of retail space will front Biscayne Boulevard. The complex is in close proximity to the Adrienne Arsht Center for the Performing Arts, the downtown Miami entertainment district, and the Omni neighborhood, one of the city’s fast-growing residential areas.

| Feb 11, 2011

Chicago architecture firm planning one of China’s tallest towers

Chicago-based Goettsch Partners was commissioned by developer Guangzhou R&F Properties Co. Ltd. to design a new 294,570-sm mixed-use tower in Tianjin, China. The Tianjin R&F Guangdong Tower will be located within the city’s newly planned business district, and at 439 meters it will be one of China’s tallest buildings. The massive complex will feature 134,900 sm of Class A office space, a 400-key, five-star hotel, 55 condominiums, and 8,550 sm of retail space. The architects are designing the tower with multi-story atriums and a high-performance curtain wall to bring daylight deep into the building, thereby creating deeper lease spans. The project is currently finishing design.

| Feb 11, 2011

Two projects seek to reinvigorate Los Angeles County medical center

HMC Architects designed two new buildings for the Los Angeles County Martin Luther King, Jr., Medical Center as part of a $360 million plan to reinvigorate the campus. The buildings include a 120-bed hospital, which involves renovation of an existing tower and several support buildings, and the construction of a new multi-service ambulatory care center. The new facilities will have large expanses of glass at all waiting and public areas for unobstructed views of downtown Los Angeles. A curved glass entrance canopy will unite the two buildings. When both projects are completed—the hospital in 2012 and the ambulatory care center in 2013—the campus will have added more than 460,000 sf of space. The hospital will seek LEED certification, while the ambulatory care center is targeting LEED Silver.

| Feb 11, 2011

Sustainable community center to serve Angelinos in need

Harbor Interfaith Services, a nonprofit serving the homeless and working poor in the Harbor Area and South Bay communities of Los Angeles, engaged Withee Malcolm Architects to design a new 15,000-sf family resource center. The architects, who are working pro bono for the initial phase, created a family-centered design that consolidates all programs into a single building. The new three-story space will house a resource center, food pantry, nursery and pre-school, and administrative offices, plus indoor and outdoor play spaces and underground parking. The building’s scale and setbacks will help it blend with its residential neighbors, while its low-flow fixtures, low-VOC and recycled materials, and energy-efficient mechanical equipment and appliances will help it earn LEED certification.

| Feb 11, 2011

Texas megachurch inspired by yesteryear’s materials, today’s design vocabulary

The third phase of The First Baptist Church of Pasadena, Texas, involves construction of a new 115,000-sf worship center addition. Currently in design by Zeigler Cooper, the project will include a 2,500-seat worship center (with circular layout and space for a 50-person orchestra and 200-person choir), a 500-seat chapel (for weddings, funerals, and special events), and a prayer room. The addition will connect to the existing church and create a Christian Commons for education, administration, music, and fellowship. The church asked for a modern design that uses traditional materials, such as stone, brick, and stained glass. Construction is scheduled to begin this summer.

| Feb 11, 2011

Apartment complex caters to University of Minnesota students

Twin Cities firm Elness Swenson Graham Architects designed the new Stadium Village Flats, in the University of Minnesota’s East Bank Campus, with students in mind. The $30 million, six-story residential/retail complex will include 120 furnished apartments with fitness rooms and lounges on each floor. More than 5,000 sf of first-floor retail space and two levels of below-ground parking will complete the complex. Opus AE Group Inc., based in Minneapolis, will provide structural engineering services.

| Feb 11, 2011

Four-story library at Salem State will hold half a million—get this—books!

Salem State University in Massachusetts broke ground on a new library and learning center in December. The new four-story library will include instructional labs, group study rooms, and a testing center. The modern, 124,000-sf design by Boston-based Shepley Bulfinch includes space for 500,000 books and study space for up to a thousand students. Sustainable features include geothermal heating and cooling, rainwater harvesting, and low-flow plumbing fixtures.

| Feb 11, 2011

Green design, white snow at Egyptian desert retail complex

The Mall of Egypt will be a 135,000-sm retail and entertainment complex in Cairo’s modern 6th of October district. The two-story center is divided into three themed zones—The City, which is arranged as a series of streets lined with retail and public spaces; The Desert Valley, which contains upscale department stores, international retailers, and a central courtyard for music and other cultural events; and The Crystal, which will include leisure and entertainment venues, including a cinema and indoor snow park. RTKL is designing the massive complex to LEED Silver standards.

| Feb 10, 2011

7 Things to Know About Impact Glazing and Fire-rated Glass

Back-to-basics answers to seven common questions about impact glazing and fire-rated glass.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021