flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Changes to ICC building codes development process aimed at more in-depth vetting of proposals

Codes and Standards

Changes to ICC building codes development process aimed at more in-depth vetting of proposals

The new process will provide more opportunity for proponents to build consensus on code changes.


By PETER FABRIS, CONTRIBUTING EDITOR | March 24, 2023
Photo: Nathan Waters via Unsplash
Photo: Nathan Waters via Unsplash

The International Code Council (ICC) is revising its code development process to provide more in-depth scrutiny of code change proposals.

The changes will take effect in 2024-2026 for the development of the 2027 International Codes (I-Codes). They will move the development process to an integrated and continuous three-year cycle.

In the new timeline, the first year will include two Committee Action Hearings for Group A Codes; year two will include two Committee Action Hearings for Group B Codes; and year three will be the joint Public Comment Hearings and Online Governmental Consensus Vote for both Group A and B Codes.

“The addition of the second Committee Actions Hearings in year one and two will foster a more in-depth vetting of code change proposals, allowing an opportunity for the committee members to review and evaluate the original proposals and consider the submitted responses,” according to an ICC news release. “This also provides more opportunity for proponents to build consensus for their code change proposal and ensure the best version of their intended improvement to the existing codes.”

With combined Public Comment Hearings in the third year, voting members will be able to vote on all suggested changes to the next edition of the I-Codes at one time, the release says. The updated process also provides more opportunity for proposed new referenced standards to be developed and finalized on a consistent timeline regardless of the group (Group A or B) with which they are associated.

Related Stories

Codes and Standards | Feb 9, 2022

Climate impact of gas stoves in U.S. equal to half a million cars

New study could increase momentum to ban fossil fuels in new buildings.

Codes and Standards | Feb 7, 2022

Energy efficiency ratings not reflecting true energy use

Highest rated U.K. buildings are less efficient than lower rated ones.

Codes and Standards | Feb 3, 2022

Illinois tops USGBC list of states with the most LEED certified projects in 2021

Top 10 states plus D.C. certified more than 247 million gross square feet.

Codes and Standards | Feb 2, 2022

Public works contracting reform advances in New York State

Governor signs bill to form advisory council that will propose policy changes.

Codes and Standards | Feb 2, 2022

Commercial and multifamily construction starts rebounded in 2021

Following COVID uncertainty in 2020, the industry recovered, but still lags 2019 levels.

Codes and Standards | Feb 1, 2022

Biden Administration launches state, local coalition to boost building performance standards

Will focus on energy efficiency and electrification across the buildings sector.

Codes and Standards | Jan 26, 2022

Downtown digital twin to aid Las Vegas in setting policy priorities

Will be used to address energy use, emissions, traffic, parking, noise, and emergency management.

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021