Drawing inspiration from the volcanic basalt stone, the horizontal layers of rock, and the atmosphere of the caves and clefts of the Icelandic landscape, C.F. Møller and Arkthing have won a competition to design Landsbankinn’s newest bank in Reykjavik.
The bank’s façade is composed of primarily two materials: glass and basalt. These two elements, along with other components common in Icelandic nature, can also be found inside the building. In the foyer, a skylight opening is formed in basalt stone. In the atria, the horizontal bands of the terraces are expressed in in-situ concrete, meant to reference Icelandic rock formations.
Rendering courtesy Beauty and the Bit.
The office spaces are designed to be open and flexible and are placed into four complex houses. The different houses come together to function as one building that is oriented with views to the sea, Harpa Concert Hall, and Arnarhóll Park. The atria are inside the two tallest houses to ensure daylight reaches deep into the structure. The two lowest houses provide glazing and connections to external terraces and gardens.
Rendering courtesy Beauty and the Bit.
Public functions are located on the ground floor and along the façade, which activates a new pedestrian street leading to Harpa Concert Hall. An internal, sheltered public passage links the new facilities and creates a shortcut for the city.
Construction is planned to begin in early 2019.
Rendering courtesy Beauty and the Bit.
C.F. Møller Architects / Arkthing.
Related Stories
Office Buildings | Apr 21, 2015
How to create an 'emotionally intelligent' workplace
Emotional intelligence is the leading predictor of performance in the workplace and the strongest driver of leadership and personal excellence.
Office Buildings | Apr 8, 2015
Facebook plans to build two more Frank Gehry-designed offices
In addition to office space, Facebook’s development involves a bridge for pedestrians and cyclists.
Mixed-Use | Apr 7, 2015
$100 billion 'city from scratch' taking shape in Saudi Arabia
The new King Abdullah Economic City was conceived to diversify the kingdom's oil-dependent economy by focusing more in its shipping industry.
Green | Apr 7, 2015
USGBC survey shows Fortune 200 companies prioritize green building
The world’s top-performing companies are prioritizing sustainability as part of their corporate social responsibility efforts, and a majority of them are using LEED to achieve their goals, according to the new survey.
Office Buildings | Apr 1, 2015
Facebook opens Gehry-designed headquarters: ‘The largest open floor plan in the world,’ says Zuckerberg
Employees have started moving into Facebook’s new headquarters, a 435,555-sf building in Menlo Park, Calif., whose famed architect Frank Gehry describes as “unassuming, matter-of-fact, and cost effective.”
Office Buildings | Apr 1, 2015
IBM's supercomputer Watson finds new home in Manhattan's Silicon Alley
The new headquarters for the former Jeopardy champ was conceived as a showcase for Watson’s capabilities, and as an inspirational workspace for Millennials and idea generators of all ages.
Office Buildings | Mar 29, 2015
Chance encounters and the ‘action’ office: Do collisions spark innovation?
Google, Facebook, Samsung, and Tencent have all unveiled plans for “action” offices designed to get their people moving, interacting, huddling, collaborating—all in the name of innovation.
Codes and Standards | Mar 12, 2015
Energy Trust of Oregon offers financial incentives for net-zero buildings
The organization is offering technical assistance along with financial benefits.
BIM and Information Technology | Mar 11, 2015
Google plans to use robots, cranes to manipulate modular offices at its new HQ
Its visions of “crabots” accentuate the search-engine giant’s recent fascination with robotics and automation.
Modular Building | Mar 10, 2015
Must see: 57-story modular skyscraper was completed in 19 days
After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”