Drawing inspiration from the volcanic basalt stone, the horizontal layers of rock, and the atmosphere of the caves and clefts of the Icelandic landscape, C.F. Møller and Arkthing have won a competition to design Landsbankinn’s newest bank in Reykjavik.
The bank’s façade is composed of primarily two materials: glass and basalt. These two elements, along with other components common in Icelandic nature, can also be found inside the building. In the foyer, a skylight opening is formed in basalt stone. In the atria, the horizontal bands of the terraces are expressed in in-situ concrete, meant to reference Icelandic rock formations.
Rendering courtesy Beauty and the Bit.
The office spaces are designed to be open and flexible and are placed into four complex houses. The different houses come together to function as one building that is oriented with views to the sea, Harpa Concert Hall, and Arnarhóll Park. The atria are inside the two tallest houses to ensure daylight reaches deep into the structure. The two lowest houses provide glazing and connections to external terraces and gardens.
Rendering courtesy Beauty and the Bit.
Public functions are located on the ground floor and along the façade, which activates a new pedestrian street leading to Harpa Concert Hall. An internal, sheltered public passage links the new facilities and creates a shortcut for the city.
Construction is planned to begin in early 2019.
Rendering courtesy Beauty and the Bit.
C.F. Møller Architects / Arkthing.
Related Stories
Market Data | Mar 6, 2016
Real estate execs measure success by how well they manage ‘talent,’ costs, and growth
A new CBRE survey finds more companies leaning toward “smarter” workspaces.
Office Buildings | Mar 2, 2016
HDR redesigns Twin Cities' studio to have coffee shop vibe
With open spaces, huddle rooms, and a design lab, the firm's new digs are drastically different than the old studio, which felt like working in a law office. Design Principal Mike Rodriguez highlights HDR's renovation plan.
Office Buildings | Mar 1, 2016
SmithGroupJJR and The Christman Company create a financial headquarters without the drab
The “un-bank” design ditched the stuffy design elements typical of financial institutions and, instead, created something much more inviting.
Office Buildings | Feb 29, 2016
Mobileapolis: An open experiment in workplace mobility
Check out this fun infographic that explains Perkins+Will's ambitions, findings, and next steps for the future home of the firm's Minneapolis office.
Office Buildings | Feb 26, 2016
Benching, desking, and (mostly) paper-free: Report identifies top trends in workplace design for 2016
The report, from Ted Moudis Associates, encompasses over 2.5 million sf of workspace built over the past two years.
Game Changers | Feb 5, 2016
Asia’s modular miracle
A prefab construction company in China built a 57-story tower in 19 days. Here’s how they did it.
Game Changers | Feb 4, 2016
GAME CHANGERS: 6 projects that rewrite the rules of commercial design and construction
BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.
Mixed-Use | Jan 25, 2016
SOM unveils renderings of dual-tower Manhattan West development
The five million-sf project includes two office towers, a residential tower, retail space, and a new public square.
Office Buildings | Jan 21, 2016
Nike reveals design, first images of planned 3.2 million-sf expansion to its world headquarters
The expansion looks to combine design elements inspired by human movement, speed, and the strength and energy of competition.
| Jan 14, 2016
How to succeed with EIFS: exterior insulation and finish systems
This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.