Drawing inspiration from the volcanic basalt stone, the horizontal layers of rock, and the atmosphere of the caves and clefts of the Icelandic landscape, C.F. Møller and Arkthing have won a competition to design Landsbankinn’s newest bank in Reykjavik.
The bank’s façade is composed of primarily two materials: glass and basalt. These two elements, along with other components common in Icelandic nature, can also be found inside the building. In the foyer, a skylight opening is formed in basalt stone. In the atria, the horizontal bands of the terraces are expressed in in-situ concrete, meant to reference Icelandic rock formations.
Rendering courtesy Beauty and the Bit.
The office spaces are designed to be open and flexible and are placed into four complex houses. The different houses come together to function as one building that is oriented with views to the sea, Harpa Concert Hall, and Arnarhóll Park. The atria are inside the two tallest houses to ensure daylight reaches deep into the structure. The two lowest houses provide glazing and connections to external terraces and gardens.
Rendering courtesy Beauty and the Bit.
Public functions are located on the ground floor and along the façade, which activates a new pedestrian street leading to Harpa Concert Hall. An internal, sheltered public passage links the new facilities and creates a shortcut for the city.
Construction is planned to begin in early 2019.
Rendering courtesy Beauty and the Bit.
C.F. Møller Architects / Arkthing.
Related Stories
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 23, 2012
Thornton Tomasetti project wins AISC Merit Award
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.
| Apr 20, 2012
Century-old courthouse renovated for Delaware law firm offices
To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building.
| Apr 19, 2012
KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed
First of eight buildings highlights unique amenities.
| Apr 19, 2012
Nauset begins work on $20M Joint Forces HQ at Hanscom AFB
3D imaging key to project timetable and cost containment.
| Apr 17, 2012
FMI report examines federal construction trends
Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.
| Apr 17, 2012
Miramar College police substation in San Diego receives LEED Platinum
The police substation is the first higher education facility in San Diego County to achieve LEED Platinum Certification, the highest rating possible.