Drawing inspiration from the volcanic basalt stone, the horizontal layers of rock, and the atmosphere of the caves and clefts of the Icelandic landscape, C.F. Møller and Arkthing have won a competition to design Landsbankinn’s newest bank in Reykjavik.
The bank’s façade is composed of primarily two materials: glass and basalt. These two elements, along with other components common in Icelandic nature, can also be found inside the building. In the foyer, a skylight opening is formed in basalt stone. In the atria, the horizontal bands of the terraces are expressed in in-situ concrete, meant to reference Icelandic rock formations.
Rendering courtesy Beauty and the Bit.
The office spaces are designed to be open and flexible and are placed into four complex houses. The different houses come together to function as one building that is oriented with views to the sea, Harpa Concert Hall, and Arnarhóll Park. The atria are inside the two tallest houses to ensure daylight reaches deep into the structure. The two lowest houses provide glazing and connections to external terraces and gardens.
Rendering courtesy Beauty and the Bit.
Public functions are located on the ground floor and along the façade, which activates a new pedestrian street leading to Harpa Concert Hall. An internal, sheltered public passage links the new facilities and creates a shortcut for the city.
Construction is planned to begin in early 2019.
Rendering courtesy Beauty and the Bit.
C.F. Møller Architects / Arkthing.
Related Stories
| Jan 31, 2013
The Opus Group completes construction of corporate HQ for Church & Dwight Co.
The Opus Group announced today the completion of construction on a new 250,000-square-foot corporate headquarter campus for Church & Dwight Co., Inc., in Ewing Township, near Princeton, N.J.
| Jan 31, 2013
More cities requiring large buildings to use EPA’s energy management and reporting
In 2012, Philadelphia joined several other U.S. cities in passing a requirement that large buildings use Portfolio Manager, the Environmental Protection Agency’s energy management tool, to measure and report energy performance.
| Jan 29, 2013
Astellas' New Headquarters for the Americas Earns LEED Gold Certification
The new headquarters for Astellas in the Americas in Northbrook, Ill., has been awarded LEED Gold certification by the USGBC.
| Jan 16, 2013
SOM’s innovative Zhengzhou Greenland Plaza opens
The 2.59-million-square-feet building houses a mixed-use program of offices on its lower floors and a 416-room hotel.
| Dec 9, 2012
The owner’s perspective: high-rise buildings
Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”
| Nov 28, 2012
Project team to showcase design for first mixed-use retail center of its kind in Mexico City
Project reaching construction milestone, offering national model for urban development in Mexico.
| Nov 6, 2012
Goettsch Partners designs new tower in Shunde, China
200-meter-tall building will be located between Guangzhou and Hong Kong.
| Nov 1, 2012
Greenbuild 2012 Report: Green Architecture Firms
Design firms deliver gold, platinum, even net-zero projects
| Oct 17, 2012
Denver office building makes use of single-component wall system for retrofit
The Building Team selected Centria's Formawall Dimension Series to help achieve the retrofit project's goals of improved aesthetics, sustainability, and energy efficiency.