flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CEU series examines environmental footprint and performance properties of wood, concrete, and steel

CEU series examines environmental footprint and performance properties of wood, concrete, and steel


By By BD+C Staff | September 29, 2011
A Natural Choice: How Wood Contributes to Sustainabilitys Triple Bottom Line, is the third CEU course in a three-part series

 

naturally:wood, a resource of British Columbia’s Forestry Innovation Investment, has released “A Natural Choice: How Wood Contributes to Sustainability’s Triple Bottom Line,” the third CEU course in a three-part series dedicated to examining and comparing the environmental footprint of wood, concrete and steel. Together, the three courses offer architects and specifiers an overview of each material’s performance attributes and explore how wood fits into the overall design of a sustainably built structure.

The three courses comprise:

Part 1: “Materials Matter”

Designing sustainable buildings requires an understanding of the environmental footprint of each material in the structure. Using research and facts, “Materials Matter” examines the differences between three common building materials—wood, steel and concrete—in terms of their environmental footprint at several stages of the life-cycle process, including raw resource extraction, manufacturing and transportation. Responsible procurement, sustainability and community issues also are discussed.

Part 2: “Materials in Action”

The second course delves even deeper by exploring how wood, concrete and steel have an environmental impact on building construction, operation and end of life. This article explains the differences between these three materials in terms of basic characteristics and material properties, performance during the building operations phase, and sustainability factors including carbon footprint and material reuse.

Part 3: “A Natural Choice”

By examining how wood contributes to a project’s environmental bottom line, the final course in the series provides a broader view of the meaning of sustainability, while offering specific examples of rating systems and defining green design. BD+C

Related Stories

| Feb 6, 2012

Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation

Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021