The Center for Sustainable Research (CSBR), in conjunction with the Lawrence Berkeley National Laboratory (LBNL), the Alliance to Save Energy and the U.S. Department of Energy, launched www.CommercialWindows.org – a website that provides information and performance data on the energy efficiency, interior environment, and technical considerations that influence commercial window design decisions.
According to LBNL research, it is estimated that windows are responsible for 39% of commercial heating energy use and 28% of commercial cooling energy use – almost 1.5% of all total U.S. energy consumed.
CommercialWindows.org features a number of comprehensive resources including a Façade Design Tool – an interactive, online tool that allows users to choose, early in the design process, various conditions for windows to rank and compare different performance outcomes. The site also features performance data, design guidance, information on window technologies, and case studies with examples of the various uses of high-performing glass and façade systems.
The Façade Design Tool allows designers and decision-makers to compare design strategies for orientation, glazing, window area, and shading – for offices and schools in hot, cold and mixed climates – without the need for detailed inputs. After choosing a location, building type, and orientation, the Tool’s input design parameters let users design a façade system and quickly get performance outcomes for energy, peak electric demand, carbon, daylight, glare, and thermal comfort. These performance outcomes help the decision-maker to understand the environmental and human comfort impacts of various design decisions early and to facilitate integrated design considerations during design development.
The Façade Design Tool’s simulated results were generated using COMFEN, a tool to be used early in the design process to model comparative designs to help determine the optimal window design. COMFEN uses a graphical user interface with an Energy Plus engine providing performance results. COMFEN can be downloaded from LBNL’s web site at: windows.lbl.gov/software. BD+C
Related Stories
| Apr 8, 2014
Science, engineering find common ground on the Northeastern University campus [slideshow]
The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.
| Apr 8, 2014
40 Under 40 winners: Meet the contractors
Of the up-and-coming AEC professionals to be named to the class of 2014, nine make their living as contractors.
| Apr 7, 2014
40 Under 40 winners: Meet the architects
Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.
| Apr 4, 2014
$25 million Orion Jet Center designed by SchenkelShultz now open
As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe.
| Apr 3, 2014
Security, accountability, and cloud access: Can you really have it all?
I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally.
| Apr 2, 2014
The new model of healthcare facility management
A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Apr 1, 2014
The risks of mismatched fire-rated assemblies
Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team.
| Apr 1, 2014
Planned global commerce center breaks ground near Phoenix
When completed, PhoenixMart will be one of the largest single-level trade centers in the U.S.