The Center for Sustainable Research (CSBR), in conjunction with the Lawrence Berkeley National Laboratory (LBNL), the Alliance to Save Energy and the U.S. Department of Energy, launched www.CommercialWindows.org – a website that provides information and performance data on the energy efficiency, interior environment, and technical considerations that influence commercial window design decisions.
According to LBNL research, it is estimated that windows are responsible for 39% of commercial heating energy use and 28% of commercial cooling energy use – almost 1.5% of all total U.S. energy consumed.
CommercialWindows.org features a number of comprehensive resources including a Façade Design Tool – an interactive, online tool that allows users to choose, early in the design process, various conditions for windows to rank and compare different performance outcomes. The site also features performance data, design guidance, information on window technologies, and case studies with examples of the various uses of high-performing glass and façade systems.
The Façade Design Tool allows designers and decision-makers to compare design strategies for orientation, glazing, window area, and shading – for offices and schools in hot, cold and mixed climates – without the need for detailed inputs. After choosing a location, building type, and orientation, the Tool’s input design parameters let users design a façade system and quickly get performance outcomes for energy, peak electric demand, carbon, daylight, glare, and thermal comfort. These performance outcomes help the decision-maker to understand the environmental and human comfort impacts of various design decisions early and to facilitate integrated design considerations during design development.
The Façade Design Tool’s simulated results were generated using COMFEN, a tool to be used early in the design process to model comparative designs to help determine the optimal window design. COMFEN uses a graphical user interface with an Energy Plus engine providing performance results. COMFEN can be downloaded from LBNL’s web site at: windows.lbl.gov/software. BD+C
Related Stories
Building Team Awards | May 27, 2016
Big police academy trains thousands of New York's finest
The Police Training Academy in Queens, N.Y., consists of a 480,000-sf academic/administration building and a 240,000-sf physical training facility, linked by an aerial pedestrian bridge.
Building Team Awards | May 26, 2016
Cimpress office complex built during historically brutal Massachusetts winter
Lean construction techniques were used to build 275 Wyman Street during a winter that brought more than 100 inches of snow to suburban Boston.
Building Team Awards | May 25, 2016
New health center campus provides affordable care for thousands of Northern Californians
The 38,000-sf, two-level John & Susan Sobrato Campus in Palo Alto is expected to serve 25,000 patients a year by the end of the decade.
Architects | May 24, 2016
Lissoni Architettura’s NYC Aquatrium takes first place in New York City Waterfront Design competition
NYC Aquatrium was selected from among 178 proposals from 40 countries as the winner of Arch Out Loud’s NYC Aquarium & Public Waterfront design competition
Building Team Awards | May 24, 2016
Los Angeles bus depot squeezes the most from a tight site
The Building Team for the MTA Division 13 Bus Operations and Maintenance Facility fit 12 acres’ worth of programming in a multi-level structure on a 4.8-acre site.
Building Team Awards | May 23, 2016
'Greenest ballpark' proves a winner for St. Paul Saints
Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.
Architects | May 20, 2016
NCARB survey indicates continued growth of U.S. architects
The number of U.S. architects surpassed 110,000 in 2015, a 2% increase from the previous year.
Multifamily Housing | May 19, 2016
Architect Jean Nouvel designs flood-resilient Monad Terrace in Miami Beach
A man-made lagoon with lush vegetation at the base of the complex is expected to adapt to climate change and rising sea levels.
Building Team Awards | May 19, 2016
Chinatown library unites and serves two emerging Chicago neighborhoods
The 16,000-sf, pebble-shaped Chinatown Branch Library was built at the intersection of new and old Chinatown neighborhoods. The goal is for the building to unite the communities and serve as a catalyst for the developing area.
Building Team Awards | May 19, 2016
NYC subway station lights the way for 300,000 riders a day
Fulton Center, which handles 85% of the riders coming to Lower Manhattan, is like no other station in the city’s vast underground transit web—and that’s a good thing.