Wentworth Institute of Technology’s first new academic building in 45 years was recently completed on the university’s Boston campus. The Leers Weinzapfel Associates-designed Center for Engineering, Innovation, and Sciences is a multi-disciplinary facility meant to expand the school’s engineering education.
The four-story, 75,000-sf facility will offer an environment for students of biology, civil engineering, mechanical engineering, biomedical engineering, and biological engineering to collaborate. The building’s ground floor houses an additive manufacturing lab and Accelerate, an interdisciplinary and entrepreneurial project-based program. Floors two through four include laboratories, student learning and meeting spaces, offices, and support/storage space.
The campus is vulnerable to flooding, so the Center’s ground floor was built two feet above current grade and the design minimized the systems equipment in the basement. Sustainability elements include a highly-efficient thermal envelope that includes sun shading on the east, south, and west facades, and mechanical equipment designed for maximum efficiency. The facility is targeting Leed Silver certification.
See Also: ‘One Harvard’ initiative injects new life into campus center
The Center for Engineering, Innovation, and Sciences opened in November 2018.
Related Stories
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 4, 2013
Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show
Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program.
| Aug 30, 2013
Modular classrooms gaining strength with school boards
With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 19, 2013
Reconstruction Sector Construction Firms [2013 Giants 300 Report]
Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Engineering Firms [2013 Giants 300 Report]
URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.