flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Center for Engineering, Innovation, and Sciences opens on Wentworth Institute of Technology’s Boston campus

University Buildings

Center for Engineering, Innovation, and Sciences opens on Wentworth Institute of Technology’s Boston campus

Leers Weinzapfel Associates designed the building.


By David Malone, Assocaite Editor | May 7, 2019

All photos: Albert Vecerka

Wentworth Institute of Technology’s first new academic building in 45 years was recently completed on the university’s Boston campus. The Leers Weinzapfel Associates-designed Center for Engineering, Innovation, and Sciences is a multi-disciplinary facility meant to expand the school’s engineering education.

The four-story, 75,000-sf facility will offer an environment for students of biology, civil engineering, mechanical engineering,  biomedical engineering, and biological engineering to collaborate. The building’s ground floor houses an additive manufacturing lab and Accelerate, an interdisciplinary and entrepreneurial project-based program. Floors two through four include laboratories, student learning and meeting spaces, offices, and support/storage space.

 

 

The campus is vulnerable to flooding, so the Center’s ground floor was built two feet above current grade and the design minimized the systems equipment in the basement. Sustainability elements include a highly-efficient thermal envelope that includes sun shading on the east, south, and west facades, and mechanical equipment designed for maximum efficiency. The facility is targeting Leed Silver certification.

 

See Also: ‘One Harvard’ initiative injects new life into campus center

 

The Center for Engineering, Innovation, and Sciences opened in November 2018.

 

Related Stories

University Buildings | Feb 16, 2018

The University of Washington receives a new Nanoengineering and Sciences Building

The building marks the second phase of a 168,000-sf complex.

University Buildings | Jan 31, 2018

Report: Spending spree on new buildings a risky venture for some U.S. universities

Higher education institutions continue to add new buildings in spite of increased stress on facilities management budgets, according to a new report from Sightlines.

Healthcare Facilities | Jan 29, 2018

The new Virginia Tech Biomedical Research Addition will include research facilities in five thematic areas

The project is a collaboration between Carilion Clinic and Virginia Tech.

University Buildings | Jan 19, 2018

A 360-degree classroom highlights Washington State University’s new academic innovation hub

The circle-in-the-round classroom can accommodate 275 students.

Game Changers | Jan 12, 2018

‘Kit of parts’ anchors university’s remake

Sasaki designs interchangeable spaces to support a major educational shift at Mexico’s largest university system.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021