flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Center for Engineering, Innovation, and Sciences opens on Wentworth Institute of Technology’s Boston campus

University Buildings

Center for Engineering, Innovation, and Sciences opens on Wentworth Institute of Technology’s Boston campus

Leers Weinzapfel Associates designed the building.


By David Malone, Assocaite Editor | May 7, 2019

All photos: Albert Vecerka

Wentworth Institute of Technology’s first new academic building in 45 years was recently completed on the university’s Boston campus. The Leers Weinzapfel Associates-designed Center for Engineering, Innovation, and Sciences is a multi-disciplinary facility meant to expand the school’s engineering education.

The four-story, 75,000-sf facility will offer an environment for students of biology, civil engineering, mechanical engineering,  biomedical engineering, and biological engineering to collaborate. The building’s ground floor houses an additive manufacturing lab and Accelerate, an interdisciplinary and entrepreneurial project-based program. Floors two through four include laboratories, student learning and meeting spaces, offices, and support/storage space.

 

 

The campus is vulnerable to flooding, so the Center’s ground floor was built two feet above current grade and the design minimized the systems equipment in the basement. Sustainability elements include a highly-efficient thermal envelope that includes sun shading on the east, south, and west facades, and mechanical equipment designed for maximum efficiency. The facility is targeting Leed Silver certification.

 

See Also: ‘One Harvard’ initiative injects new life into campus center

 

The Center for Engineering, Innovation, and Sciences opened in November 2018.

 

Related Stories

University Buildings | Mar 17, 2021

UIC’s Computer Design Center will help meet the demands of a growing student body

LMN Architects in collaboration with Booth Hansen is designing the project.

University Buildings | Feb 26, 2021

Dartmouth College’s new faculty and graduate student center completes

Leers Weinzapfel Associates designed the project.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Multifamily Housing | Jan 8, 2021

Student housing development in the time of COVID-19

Despite the coronavirus pandemic, many college and university residences were completed in time for classes, live or virtual. Here are 14 of the best.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

University Buildings | Dec 13, 2020

U. of Oregon’s new Knight Campus is set up to turn ideas into reality

Its design encourages occupant productivity and well-being.

Giants 400 | Dec 3, 2020

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021