Workers who use personal mobile phones on job sites present safety risks that contractors need to address.
Many workers, especially younger ones, commonly connect ear buds or head phones to their phones to listen to music or podcasts in their off hours. Some listening devices equipped with sound-canceling features that block off noises from the outside world. If workers use these devices on the job site, workers can be completely tuned out to sound cues that alert them to hazards.
Some contractors ban these devices at work, but the issue is an ongoing concern because sometimes workers don’t realize they have listening devices in their ears when they enter the construction zone. There is no specific federal regulation that prohibits the use of headphones on a construction site, but OSHA issued a letter of interpretation that says headphone entertainment on a construction site is permissible at managerial discretion.
OSHA standards do require employers to protect employees’ ears with ear protective devices. Personal headphones or ear buds do not qualify as protective equipment, though.
Related Stories
Codes and Standards | Sep 21, 2017
After construction crane collapses during Irma, regulations questioned
Cranes rated for 140 mph winds didn’t hold up to 100 mph gusts.
Codes and Standards | Sep 20, 2017
Energy efficiency measures pay off in some not-so-obvious ways
Access to better financing, tax incentives, rent premiums, among the benefits to greener buildings.
Codes and Standards | Sep 19, 2017
Benchmarking regulations prompt jump in green certified properties
2016 saw a slight rise in total certified U.S. green office space.
Codes and Standards | Sep 18, 2017
Changes likely to come to federal wetlands regulations
However, states may step up regulations as feds relax them.
Codes and Standards | Sep 14, 2017
Gentrification means a new mindset for city planners
Rising rents elicit reexamination of zoning principles.
Codes and Standards | Sep 13, 2017
OSHA issues extension for compliance with crane operator certification requirements
Comments on proposed rule sought through Sept. 29.
Codes and Standards | Sep 12, 2017
Washington, D.C. is first LEED Platinum city in the world
All city government buildings are powered by renewables.
Codes and Standards | Sep 11, 2017
Natural solutions would be most effective flood resilience policies for Houston
New green infrastructure should be part of rebuild.
Codes and Standards | Sep 8, 2017
Los Angeles luxury high-rise is first U.S. apartment building to achieve WELL Multifamily certification
Hollywood Proper Residences have verified indoor air and water quality features.
Codes and Standards | Sep 7, 2017
More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone
Properties outside of these zones are not required to carry flood insurance.